Similar Projects
Water Meter and Accessories
Post-Bid
IL

Fire Hydrants
Post-Bid
Springfield, IL 62701

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

2020 Water Leak Survey Program
Post-Bid
Darien, IL 60561

Water Main Lining Rohlwing Road
Results
Itasca, IL 60143

Various Valves
Post-Bid
Benton, IL 62812

Laraway/Gehrig Proposed Pressure Reducing Valve
Results
New Lenox, IL 60451

North RAS Valves Installation
Post-Bid
Danville, IL 61832

White Pines Subdivision Watermain Rehabilitation Phase III
Results
$7,500,000 est. value
Bensenville, IL 60106

Water Distribution System Leak Survey
Post-Bid
Oak Park, IL

2020 Water Distribution System Leak Detection
Results
Springfield, IL 62701

Water Supply Leak Detection Survey
Post-Bid
Park Ridge, IL 60068

Water System Improvements
Results
Pecatonica, IL 61063

2020 Watermain Contract B
Results
Downers Grove, IL 60515

Last Updated 12/08/2021 04:27 PM
Project Title

2021 Water Main Replacement Program

Physical Address View project details and contacts
City, State (County) O Fallon, IL 62269   (Saint Clair County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The southern part of the project is located south of US Highway 50 and east of De Soto Dr and the northern part is located north of US Highway 50 and east of S Smiley St. The project involves replacing approximately 16,600 feet of existing 6-inch and 8-inch water mains with C900 DR-18 PVC pipe. The project also consists of replacing approximately 850 feet of existing 8-inch sanitary sewer. The project shall be phased to complete the sanitary sewer and water main replacement in the southern portion of the project first, including service transfers. Some overlap in the construction on the southern portion and northern portion can be expected.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents