Similar Projects
Komarek School New Gymnasium Construction
New Construction
Conception
North Riverside, IL

2021 Washroom and Life Safety Work
Renovation
Post-Bid
Palatine, IL 60067

Molloy Education Center
Renovation, Addition
Post-Bid
Morton Grove, IL 60053

Burley ES - LBP Mitigation and ACM Patch & Repair in the Ventilation System
Term Contract, Infrastructure
Results
$29,725 CJ est. value
Chicago, IL 60657

2021 Improvements at Fierke and Kruse Education Centers
Renovation
Results
Oak Forest, Orland Park, IL 60452

Worth Elementary
Renovation, Addition
Construction
Worth, IL 60482

Washington Elementary School Facility Expansion
Addition - 7,000 SF
Construction
Park Ridge, IL 60068

Central School Addition and Renovations
Renovation, Addition
Post-Bid
Lemont, IL

Cook County 911 Offices
Renovation
Results
$3,000,000 est. value
Des Plaines, IL 60016

Morton College Gymnasium Acoustics
Renovation
Post-Bid
Cicero, IL 60804

Lester Crawl Primary Center Phase 2
Renovation
Results
Lansing, IL 60438

CPS Goode HS-Solorio HS-South Shore HS-SCI-10-12-2021
Renovation
Post-Bid
Chicago, IL 60649

Barack Obama School Outdoor Classroom
New Construction
Results
Chicago Heights, IL 60411

Countryside Elementary School Campus and Roslyn Road Elementary School Campus
New Construction
Post-Bid
Barrington, IL

Neil ES-Marquee Replacement
Renovation
Results
$5,513,692 est. value
Chicago, IL 60619

Last Updated 03/07/2023 05:43 PM
Project Title

Cook County School District 130 - 2023 Life Safety Alterations

Physical Address View project details and contacts
City, State (County) Blue Island, IL 60406   (Cook County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $5,497,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 7, 2023, the project has been awarded. A timeline for construction has not been confirmed. Plans call for life safety work at six district schools. Bids shall be submitted in an opaque sealed envelope clearly marked as SEALED BID and addressed to: Lucero Moreno, Assistant Superintendent for Business Services Cook County School District 130 12300 S. Greenwood Ave. Blue Island, IL 60406 The Board of Education reserves the right to reject any or all Bids or Parts thereof, or waive any irregularities or informalities in bidding. All bidders must comply with applicable Illinois Law requiring the payment of prevailing wages by all contractors working on public works. Each bidder must satisfactorily complete the qualification process described in Section 01000-General Requirements of the Project Manual, by providing the required Qualification Documents. The required Qualification Documents must be delivered along with the Bidder's sealed bid at the same time and place required for the bid. Contents of each Bidder's Qualification Documents will be available for public review. The Qualification Documents will be reviewed by the Owner and Architect to determine the lowest responsible Bidder. ADVERTISEMENT FOR BIDS 00030 - 1 COOK COUNTY SCHOOL DISTRICT 130 PROJ. NO. 21091 2023 LIFE SAFETY ALTERATIONS attendance can be grounds for rejection of bid. Subcontractors are encouraged, but not required to attend. Addendum #1-#2 have been issued as of 7-28-2022. A scope meeting with the apparent low Bidder/Bidders will be held after the bid opening, personnel knowledge about the project scope will be require to be available by phone after 12:00pm and by Zoom Video Communication to discuss the project scope. Post-bid interview times are as tentatively scheduled as follows:a. Apparent Low Bidder: August 3, 2022, 1:30pm - 2:30pm and will be conducted remotely via Zoom Video Conferencing.b. Apparent Second Low Bidder: 12:00pm - 1:00pm and will be conducted remotely via Zoom Video Conferencing. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents