Similar Projects
Pavement Evaluations for Interstate Maintenance
Alteration
Bidding
$25,000 est. value

Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

On Call Unpaved Streets Maintenance Project
Post-Bid
Saint Marys, GA

Southern Region Disaster Recovery Support BPA
Results

Construction of Keith Dixon Way
Results
Kingsland, GA 31548

T32 - District 5 Routine Maintenance Services
Infrastructure
Post-Bid
Baconton, Evans, GA 30809

St. Marys FY 2020 LMIG Project
Results
Saint Marys, GA 31558

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Roadway Improvements Field Creek Circle
Results
Woodbine, GA 31569

Pavement Evaluation Study
Alteration
Post-Bid
Saint Marys, GA

Asphalt Resurfacing LMIG 2020
Results
Less than $235,543 est. value
Kingsland, GA 31548

Roadway Improvements Planation Point Phase II
Results
Woodbine, GA 31569

1.443 Miles of Widening and Reconstruction for Additional Turn Lanes on SR 40 Beginning West of Grove Blvd (CS 481) and Extending East to Truss Plant Rd (PR 718)
Results

LMIG Street Resurfacing
Results
College Park, GA 30337

Richland Creek Reservoir Entrance
Results
Less than $289,298 est. value
Cartersville, GA 30120

Last Updated 04/05/2022 09:57 AM
Project Title

Road Resurfacing SPLOST VII 2022

Physical Address View project details and contacts
City, State (County) Woodbine, GA 31569   (Camden County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor will provide all labor, materials, equipment, and incidentals for roadway resurface and restripe approximately 3.57 miles of roadway surface beginning at 1979 Harriett's Bluff Road and ending at 5394 Harriett's Bluff Road, including 14 deceleration lanes. We are requesting the proposing contractor to provide proposed scope of work and details on what they will do to ensure proper preservation of the roadway. Striping will consist of thermoplastic 5” single white edge lines and 5” yellow centerlines and skip lines as currently painted. Removal and replacement of existing RPM’s are considered to be incidental to final striping. Temporary paint will be required. Double yellow line 1 mile, single yellow line 1.17 miles, skip lines 2.5 miles. The county will review any and all proposals to select the proposal that is in the counties best interest.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents