Similar Projects
Reported | 10/19/2020 12:20 PM |
Project Title | Camp Wihakowi Dam Removal |
Physical Address | View project details and contacts |
City, State (County) | Northfield, VT (Washington County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dam/Tunnel |
Contracting Method | |
Project Status | Construction Complete as of October 2020 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | A pre-bid site meeting will not be held due to the inability to gather as a large group with the COVID-19 pandemic. Pre-bid videos have been prepared that provide 1) an introduction to the project, 2) photographic tour of the site, and 3) an overview of the construction plans that describes the construction plan highlights. The videos may be accessed at Friends of the Winooski River’s YouTube channel at the following link or by sending an email request for a link: https://www.youtube.com/channel/UCU7dz6MU5zC1PPWXh4ybSwA Contact Information: Jessica Louisos |
||||||
Details | 1 Dam/Tunnel, Demolition.
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |