Reported 10/19/2020 12:20 PM
Project Title

Camp Wihakowi Dam Removal

Physical Address View project details and contacts
City, State (County) Northfield, VT   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method
Project Status Construction Complete as of October 2020
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A pre-bid site meeting will not be held due to the inability to gather as a large group with the COVID-19 pandemic. Pre-bid videos have been prepared that provide 1) an introduction to the project, 2) photographic tour of the site, and 3) an overview of the construction plans that describes the construction plan highlights. The videos may be accessed at Friends of the Winooski River’s YouTube channel at the following link or by sending an email request for a link: https://www.youtube.com/channel/UCU7dz6MU5zC1PPWXh4ybSwA Contact Information: Jessica Louisos

Details

1 Dam/Tunnel, Demolition.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents