Similar Projects
Bridgeport - Boscobel Const / Sanitary Water / MISC
Infrastructure
Design
$2,000,000 CJ est. value
Juneau, WI 53039

Oconomowoc - Mayville RR OPS / Crossing Repair / Resurface
Infrastructure
Design
$250,000 CJ est. value
Iron Ridge, WI 53035

Waupun Central Generating Plant (CGP) Water System Improvements - GPC
Infrastructure, Renovation
Bidding
$6,000,000 CJ est. value
Waupun, WI 53963

Waupun Central Generating Plant (CGP) Water System Improvements - GPC
Infrastructure, Renovation
Bidding
$6,000,000 CJ est. value
Waupun, WI 53963

Waupun Central Generating Plant (CGP) Water System Improvements - MEP
Infrastructure, Renovation
Sub-Bidding
$6,000,000 CJ est. value
Waupun, WI 53963

Waupun Central Generating Plant (CGP) Water System Improvements - MEP
Infrastructure, Renovation
Sub-Bidding
$6,000,000 CJ est. value
Waupun, WI 53963

Snow Plowing/Winter Maintenance
Term Contract
Post-Bid
Kekoskee, WI

2022 Bridge Street Reconstruction
Infrastructure
Post-Bid
Mayville, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Road Improvements
Results
Lomira, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Well No. 4 Water Treatment Plant
Demolition, New Construction, Infrastructure
Bidding
$200,000 CJ est. value
Mayville, WI 53050

2022 Discher Park Sewer Relay
Infrastructure
Post-Bid
Horicon, WI

Hot Asphalt Overlay, Shouldering and Crack Filling
Infrastructure
Results
WI

Last Updated 02/20/2023 06:31 AM
Project Title

Oconomowoc - Mayville Const / Mill and Overlay

Physical Address View project details and contacts
City, State (County) Iron Ridge, WI 53035   (Dodge County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Oconomowoc - Mayville Sth 60 to W Jct Cth S Const / Mill and Overlay Safety (Regular Hsip) Estimate Anticipated Funding $3,000,000 - $3,999,999 As of February 20, 2023, the project is in Conceptual status. Anticipated letting date is September 12, 2023. WisDOT - Oconomowoc - Mayville Const / Mill and Overlay *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents