Similar Projects
Bates Road and Dresser Hill Road Water Storage Tank Rehabilitation
Bidding
Less than $600,000 est. value
Dudley, MA 01571

State Forest Water Storage Tank
Bidding
$2,800,000 est. value
Dracut, MA

Maintenance, Repair, Modification and Asset Management of Water Storage Facilities
Post-Bid
Less than $3,500,000 est. value
Wareham, MA

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Champion City Recovery - Rail Tarping Station Replacement
New Construction
Pending Verification
Brockton, MA 02301

Communication Facilities Build-out for Ellis Road Water Tank
Post-Bid
Less than $200,000 est. value
Westminster, MA 01473

Z--CACO Marconi Water Tower Repair and Painting
Results
$250,000 to $500,000 est. value
Wellfleet, MA

Greenway Road Tank Rehabilitation
Post-Bid
$872,649 est. value
Mashpee, MA 02649

2.0 MG Prospect Street Tank Painting
Results
$1,600,000 est. value
East Longmeadow, MA

Inspection, Maintenance, Repair, Modification and Asset Management of Water Storage Facilities
Post-Bid
Millis, MA

Rehabilitation, Maintenance, Repair, Modification and Asset Management of Water Storage Facilities
Results
Less than $1,986,000 est. value
Marshfield, MA

68,000 Gallon Steel Tank With An NSFD/ANSI 61 Coating System
Term Contract
Post-Bid
Less than $80,000 est. value
Turners Falls, MA

Ballardvale Water Storage Tank Rehabilitation
Results
Wilmington, MA

Last Updated 04/26/2021 10:33 AM
Project Title

Southbridge Water System

Physical Address View project details and contacts
City, State (County) Southbridge, MA   (Worcester County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 04/26/21 until 05/04/21
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of providing complete operation, maintenance and management services for the Southbridge Water System which consists of five surface water reservoirs, one filtration plant, six pumping stations, four water storage tanks and approximately 100 miles of water main. The water system serves a population of approximately 15,500 plus a portion of the town of Charlton. The water treatment plant is located at 511 Breakneck Road, Southbridge, MA. The distribution and support staff are based at the DPW Facility at 185 Guelphwood Road, Southbridge, MA.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents