Similar Projects
Wasson Way Uptown Connector Trail - State of Ohio
Infrastructure
Conception
$250,000 est. value
Cincinnati, OH 45207

West Fork Channel Rehabilitation - City of Cincinnati
Infrastructure
Conception
$1,000,000 CJ est. value
Cincinnati, OH 45202

The RED - Commercial Building
New Construction, Infrastructure - 50,000 SF
Design
$15,000,000 CJ est. value
Cincinnati, OH 45227

Lindsay Lofts and Blair Lofts Phase II
New Construction, Infrastructure
Design
$24,000,000 CJ est. value
Cincinnati, OH 45229

Redevelopment of 31 Garfield Place
Infrastructure
Post-Bid
Cincinnati, OH 45202

Regent Avenue Reconstruction
Infrastructure
Post-Bid
$1,600,000 est. value
Norwood, OH 45212

Vera, Elbrook and Vera Service Drive Improvement
Results
Golf Manor, OH

Sundale Avenue Improvements
Results
North College Hill, OH 45239

Montgomery Quarter
New Construction - 192,000 SF
Construction
$150,000,000 est. value
Montgomery, OH 45242

Montgomery Quarter - Public Site Improvements - Sequence 3
Construction
$5,200,000 est. value
Cincinnati, OH 45242

RFP Engineering - Water Main Replacement 2023 Project Bundle 4
Infrastructure
Pending Verification
$400,000 CJ est. value
Cincinnati, OH 45202

Artisan Village
New Construction, Infrastructure - 440,000 SF
Pending Verification
$1,300,000,000 CJ est. value
Cincinnati, OH 45246

Bolton Plant Well #4 Replacement - City of Cincinnati
Infrastructure
Conception
$1,500,000 CJ est. value
Cincinnati, OH 45207

Logan Common - 42 Unit Multifamily Building
New Construction, Infrastructure - 20,000 SF
Design
$5,000,000 CJ est. value
Cincinnati, OH 45202

Buckingham Place and Cambridge Avenue Improvements
Infrastructure
Post-Bid
Cincinnati, OH 45227

Last Updated 01/09/2023 02:10 PM
Project Title

Cincinnati Public Radio Headquarters

Physical Address View project details and contacts
City, State (County) Cincinnati, OH 45207   (Hamilton County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Communication Building, Paving/Reconstruction, Site Development
Contracting Method General Contractor to Subcontract, Bids by Invitation
Project Status Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $26,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 2 story, 30,000 square foot building to be used as a new headquarters. As of January 6, 2023, a general contractor has been selected. Construction is expected to start in Summer, 2023 and will take 15 months to be completed.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

2 Stories Above Grade, 30,000 SF.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Audio-Visual Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Seating.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Communications Equipment Room Fittings, Communications Backbone Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents