Similar Projects
Gatewood ES Exterior Door and HVAC Upgrades
Alteration
Bidding
$2,100,000 to $2,400,000 est. value
Seattle, WA 98136

YVS Main Building HVAC Repairs
Alteration
Bidding
$187,000 to $330,000 est. value
Olympia, WA

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

North Franklin School District Connell High School HVAC Replacements
Alteration
Results
Connell, Pasco, WA 99326

51st Circle HVAC Purchase and Installation
Alteration
Results
Vancouver, WA 98661

WCCW MSU Building Climate Control Improvements
Alteration
Bidding
$860,000 to $1,010,000 est. value
Gig Harbor, WA 98332

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Clallam County Courthouse VAV Replacement Project
Alteration
Results
$330,000 est. value
Port Angeles, WA 98362

Chiller and Boiler Chemical Testing and Maintenance Services
Alteration
Bidding
Vancouver, WA

City Hall HVAC Monitoring
Alteration
Post-Bid
$28,840 est. value
Sammamish, WA 98075

PPWWTF Solids Drying Heat Exchanger Repairs
Alteration
Results
$200,000 to $250,000 est. value
Edmonds, WA 98020

242A-Ba Boiler - Third Party Boiler Inspection
Term Contract
Bidding
Richland, WA

Master Contract for HVAC Service - Statewide Opportunities
Term Contract
Post-Bid

Headquarters Diesel Exhaust Removal System
Alteration
Results
$92,500 est. value
Belfair, WA 98528

Last Updated 01/21/2022 09:23 AM
Project Title

Poulsbo Middle School Building 3 HVAC Replacement

Physical Address View project details and contacts
City, State (County) Poulsbo, WA 98370   (Kitsap County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $550,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes, but is not limited to: Replace two rooftop packaged gas fired furnaces with energy recovery. Connect new units to existing electrical, gas piping and ductwork with duct transitions as required. Integrate new units into the existing Alerton controls system with new controllers. Provide new controls JACE.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents