Similar Projects
3000 and 3070 S Walnut St Warehouse / Bloomington
New Construction, Infrastructure
Design
$1,500,000 CJ est. value
Bloomington, IN 47401

East Kirkwood Avenue Multi-Residential Development / Bloomington
New Construction, Infrastructure
Design
$9,430,000 CJ est. value
Bloomington, IN 47408

Clear Creek Culvert Reconstruction (Dunn to Indiana)
Infrastructure
Bidding
$590,000 CJ est. value
Bloomington, IN 47405

Trades District Technology Center
LEED Certification, New Construction, Infrastructure - 22,233 SF
Post-Bid
$7,000,000 CJ est. value
Bloomington, IN 47404

Wright Quad Renovation - Indiana University - Bloomington Campus - Bid Package #1
Renovation, Infrastructure
Post-Bid
$15,000,000 CJ est. value
Bloomington, IN 47406

SE000A Site - Campus Sidewalks - Central Campus
Infrastructure
Results
$309,400 CJ est. value
Bloomington, IN 47405

Bike and Pedestrian Facilities
Infrastructure
Results
$4,562,693 CJ est. value
Bloomington, IN 47403

Indianapolis Academic Health Center Medical Education and Research Facility
New Construction, Infrastructure
Construction
$50,000,000 CJ est. value
Indianapolis, IN 46202

The Retreat at Swithchyard Park
New Construction, Infrastructure - 3,000 SF
Construction
$24,000,000 CJ est. value
Bloomington, IN 47401

2nd Street Commercial Addition
Addition, Demolition, Infrastructure, Renovation - 17,690 SF
Pending Verification
$3,500,000 CJ est. value
Bloomington, IN 47401

West Kirkwood Avenue Apartments
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Bloomington, IN 47404

Monroe Convention Center Expansion
Addition, Demolition, Renovation, Infrastructure - 60,000 SF
Design
$44,000,000 CJ est. value
Bloomington, IN 47403

Asphalt Resurface
Infrastructure
Post-Bid
$3,650,000 CJ est. value
Bloomington, IN 47401

BL000A Domestic Water Distribution Replacement (Music Addition) - IU Project
Infrastructure
Results
$411,200 CJ est. value
Bloomington, IN 47405

Hilltop Meadows
New Construction, Infrastructure
Construction
$43,000,000 CJ est. value
Bloomington, IN 47403

Last Updated 10/13/2023 07:06 AM
Project Title

Bloomington Fire Station 1 Renovation/Addition

Physical Address View project details and contacts
City, State (County) Bloomington, IN 47401   (Monroe County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Fire/Police Station, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $220,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

This project shall include but is not limited to, improvements, including site preparation, excavation, earthwork, and partial building demolition. A building addition and full facility renovation, encompassing to rough and finish carpentry, structural steel, masonry, interior finishes, glazing, and painting. Question Deadline: 10/31/2023 at 3:30 PM ET The project in its entirety shall be completed by October 1, 2024. A cashier's check or certified check drawn on an acceptable bank or a Bid bond equal to five (5) percent of the total amount of bid. The successful bidder shall furnish a performance bond and a payment bond for one hundred percent (100%) of the contract amount prior to the execution of the contract and said bonds shall remain in effect for a period of one (1) year after final acceptance of the work. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to the Construction Manager in writing. Contact information and submittal procedures for such questions are as follows:, City of Bloomington, Attn: Chris Ciolli, Email; Cciolli@weddlebros.com, Phone: 812-322-9870 Contractor certifies that it will furnish CITY any and all documentation, certification, authorization, license, permit or registration required by the laws or rules and regulations of the City of Bloomington, the State of Indiana and the United States. The Board of Public Works reserves the right to waive any informalities and to accept or reject any or all Bids submitted. The Board of Public Works may hold bids for a period not to exceed sixty (60) days from the date of the opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of the Bidders prior to awarding the contract. Anticipated Award Date: 11/21/2023

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents