Similar Projects
A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Vertical Region 4- Regional Architect and Engineering Indefinite Delivery Indefinite Quantity Contracts
Post-Bid
$100,000 to $30,000,000 est. value

Engineering, Planning and Development
Post-Bid

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

USCG Ocean Architect/Engineering IDIQ MATOC
Results
$3,500 to $2,500,000 est. value

Architect-Engineering (AE) Indefinite Delivery Contract (IDC) in Support of the Defense Health Agency (DHA) and Component Medical Commands
Post-Bid
Less than $45,000,000 est. value
Washington, DC

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

C1da--534-21-1-5972-0001 Design Correct Seismic Deficiencies by Expanding ORS for Hybrid Capabilities- 534 (Va-21-00021425)
Post-Bid
$1,000,000 to $2,000,000 est. value
Charleston, SC 29401

Architect-Engineer Supplemental Services - Southeast Regional Office
Results

IDIQ Contract for Architect-Engineer Services for Compliance with Air Emission Regulations, EPCRA Regulations, Greenhouse Gas & All Other Environmental Media Regulations
Post-Bid

Nationwide Architect and Engineering IDIQ - Small Business Pool
Results
Less than $10,000,000 est. value

Architect and Engineering Services for Production Technical Services (PTS) for FEMA's Risk MAP Program
Post-Bid
$10,000 to $300,000,000 est. value

Highway and/or Bridge Design and Engineering Services
Results
Less than $80,000,000 est. value

Architect-Engineer (A-E) Services For Project: Dkfx-1093394 (Repair Aircraft Parking Ramp - Phase 2)
Renovation
Post-Bid
Charleston, SC 29404

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

Last Updated 07/22/2022 09:12 AM
Project Title

Comprehensive Integrated Water Plan

Physical Address View project details and contacts
City, State (County) Charleston, SC 29401   (Charleston County)
Category(s) Professional Services, Sewer and Water
Sub-Category(s) Engineering, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City is seeking a qualified firm or team to support the City's key near- and long-term water management, protection and adaptation work through the development of a Comprehensive Integrated Water Plan for the City of Charleston. All pages that require a Signature shall be included with the proposal. Failure to include these required pages may result in the proposal being deemed Non-Responsive. fferors must clearly mark as "Confidential" each part of their proposal which they consider to be proprietary information that could be exempt from disclosure under the South Carolina Freedom of Information Act, S.C. Code Ann. 30-4-10 to - 165 (2007 & Supp. 2015). See paragraph 45 for more details. The City reserves the right to determine whether this information should be exempt from disclosure and no legal action may be brought against the state or its agents for its determination in this regard. Questions regarding this solicitation must be submitted in writing to Gary Cooper or Robin Barrett Robinson no later than 2:00pm on April 14, 2022. Questions may either be faxed to 843-720-3872 or emailed to Gary Cooper, cooperg@charleston-sc.gov or Robin Barrett Robinson, robinsonr@charleston-sc.gov. The terms and conditions in this Solicitation shall prevail unless otherwise modified by the City of Charleston in an Addendum to this Solicitation. The City of Charleston reserves the right to reject, in whole or in part, any proposal which does not comply with such terms and conditions. The City of Charleston reserves the right to retain all proposals submitted and to use any ideas in a proposal regardless of whether that proposal is selected. Submission of a proposal indicates acceptance by the Offeror of the conditions contained in this Solicitation, unless clearly and specifically noted in the proposal submitted and confirmed in any resulting contract between the City of Charleston and the Offeror selected. he successful Offeror shall be notified of acceptance of its Proposal by a written Notice of Award of Contract. Successful Offeror(s) shall not undertake any work, and City shall not be responsible for payment for any work whatsoever undertaken by the successful Offeror(s) prior to issuance of the Notice to Proceed Upon the consummation of the contract for the services being solicited in this Solicitation and receipt of the Notice of Award by the successful Offeror (the "Contractor"), the Contractor shall, at all times during the term of the contract, carry insurance as required by the insurance requirements outlined in the insurance attachment which is attached hereto and incorporated by reference. The City shall not issue a Notice to Proceed until the Contractor has submitted acceptable insurance certificates(s) or endorsement(s), which must be submitted within five (5) calendar days after receipt of the Notice of Award, and which reflect that the required coverages are in place and that all premiums have been paid. Refusal or failure to submit such certificate(s) or endorsement(s) shall constitute grounds for the City to revoke its notice of award, forfeit proposal security, and award the contract to another contractor. The City may contact the Contractor's insurer(s) or insurer(s)' agent(s) directly at any time regarding its coverages, coverage amounts, or other such relevant and reasonable issues related to this contract. The Contractor(s) shall also require any sub-contractors to carry the same coverages in the same amounts. Faxed Insurance Certificate(s) and Endorsement(s) shall be accepted if received no later than the time of contract execution and the original documents are received within one (1) business day after receipt of the fax transmittals. PERMITS AND LICENSES A) The Contractor(s) shall, without additional expense to the City of Charleston, be responsible for obtaining all necessary licenses and permits required by the State of South Carolina, or the City of Charleston or any other authority having jurisdiction. B) Contractors and subcontractors are responsible at all times for obtaining applicable work permits and licenses of any kind.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents