Similar Projects
Lift Stations Modifications
Renovation
Bidding
MS

Reported 03/24/2021 12:00 AM
Project Title

Tucker Road Regional Pump Station 6 SRF Improvements

Physical Address View project details and contacts
City, State (County) Pascagoula, MS   (Jackson County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project primarily consists of the construction of a triplex submersible pump station, a triplex in-line pressure reducing pump station, approximately 900 linear feet of 24” diameter HDPE force main installed via directional drill, approximately 825 linear feet of 24” HDPE installed via open-cut, approximately 1,360 linear feet of 8” HDPE force main installed via slip-lining, approximately 1,350 linear feet of PVC gravity sewer (18” and 21” in diameter); furnishing and installing new electrical and controls; sediment and erosion control; and all incidentals and appurtenances.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents