Similar Projects
Pequabuck River Conduit - Culvert Rehabilitation
Bidding
Bristol, CT 06010

Waterworks and Sewerage Supplies
Bidding
Manchester, CT

Adjusting Manhole Frames and Valve Covers
Post-Bid
Waterford, CT

On-Call Storm Drainage Installation and Repair
Post-Bid
Windsor Locks, CT

Grease Interceptor Removal / New Installation
Results
Enfield, CT

Sanitary Sewer Manhole and Pipe Replacement
Results
South Windsor, CT

On-Call Construction Crew 2020
Term Contract
Post-Bid
Southington, CT 06489

Oakwood Avenue Phase 1 Water and Sewer Improvements Project
Results
Hartford, CT 06103

Acceptance and Disposal of Catch Basin Grit
Post-Bid
South Windsor, CT

Cargo Building Sewer Line Replacement
Results
Windsor Locks, CT 06096

Septic System Replacement
Post-Bid
Less than $75,000 est. value
Manchester, CT 06040

Sewer Repair and Related Construction Services
Results
Hartford, CT

Annual Catch Basin Cleaning Services
Term Contract
Post-Bid
Berlin, CT

Catch Basin Cleaning Services
Term Contract
Results
Hartford, CT 06106

Furnish Cast Iron Materials and Catch Basin Components
Results
Hartford, CT 06103

Last Updated 05/05/2020 01:34 PM
Project Title

On-Call Small Sanitary Sewer and Storm Drainage Contract

Physical Address View project details and contacts
City, State (County) Manchester, CT   (Hartford County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this contract is to secure an on-call contractor to perform small scale sanitary sewer and storm drainage improvements. This contract would be used for small projects at various locations throughout Manchester and could include replacing storm or sanitary sewer structures and installing small storm system or sanitary sewer system extensions. This is an on-call durational contract for the period from contract award, expected on or around May 11, 2020 through November 15, 2020. The contract may be extended at the current terms and conditions for the 2021 construction season provided the Town and Contractor mutually agree to extend

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents