Similar Projects
Trout Stream Restoration
Bidding
$640,871 est. value
Hiawassee, GA

South Palm and Hornet Ditch Drainage Improvements Project FY22
Infrastructure
Bidding
$400,000 est. value
GA

Site Pavement and Erosion Repair
Post-Bid
Savannah, GA

Davis Street and West Walker Street Drainage and Headwall Project
Post-Bid
Thomaston, GA 30286

First Street Resurfacing, Street, Water Extension
Results
Richmond Hill, GA 31324

Pike County CDBG19 - Storm Drainage and Street Improvements, Hill Top Community
Results
Less than $515,000 est. value
Zebulon, GA 30295

Sterling Drainage Improvements
Infrastructure
Bidding
$400,000 est. value
GA

Pipe Makers Canal Improvements - Division 1
Post-Bid
Pooler, GA

Irwin County 2020 LMIG Mcneil Drive
Results
Less than $79,977 est. value
GA

2020 CDBG Street and Storm Drainage Improvements
Infrastructure
Bidding
$600,000 est. value
Eatonton, GA

Lee Street Lift Station and Associated Improvements
Post-Bid
Valdosta, GA 31601

Drainage Improvements
Results
Luthersville, GA 30251

Uplands Requirement
Alteration
Bidding
$1,000,000 to $6,000,000 est. value
Fort Stewart, GA 31314

North 4Th Avenue Drainage And Sidewalk Improvements
Post-Bid
Rome, GA

Concrete Culvert - School House Road
Results
$214,662 est. value
Cedartown, GA 30125

Last Updated 05/20/2022 09:36 AM
Project Title

Fiscal Year 2022 LMIG EEE Project

Physical Address View project details and contacts
City, State (County) GA   (Dodge County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of replacement of existing damaged pipes with 3 lines of 72" reinforced concrete pipe, with Type 2 backfill material used for bedding the new pipes, including GDOT Standard 1125 headwalls on both the inlet and outlet ends also with placing rip rap and plastic filter fabric on the outlet end. Grading complete will include all necessary grading items and including removal and proper disposal of existing damage pipes and other excess materials. Traffic control for this will also include a detour.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents