Similar Projects
East Fork Pedestrian Bridge
Post-Bid
$1,063,855 est. value
Jamestown, NC

Sidewalk Enhancement Project, East Main Street Sidewalk
Post-Bid
Jamestown, NC

Keeley Park Mountain Bike Trail Project
Results
Greensboro, NC

Highway 150 Walkway Improvements
Results
Oak Ridge, NC

Lewis Community Center - Civil ADA Upgrades
Post-Bid
Greensboro, NC 27455

Friendly Avenue Sidewalk Improvements Part A
Results
Greensboro, NC

North Main Street and Lexington Avenue Intersection and Utility Improvements
Post-Bid
High Point, NC

English Street Sidewalks
Results
Greensboro, NC

Concrete Sidewalk Repair
Post-Bid
Greensboro, NC

2019 Resurfacing Curb Ramps Installation
Results
Greensboro, NC

Latham Park Greenway
Post-Bid
Greensboro, NC

Lindsay Street and Holden Road Sidewalk Improvements Safe Routes to School
Results
Greensboro, NC

Resurfacing Streets Part 2
Post-Bid
Greensboro, NC 27401

General Sidewalks Improvements
Results
Greensboro, NC

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Arden, Asheboro, Asheville, Belmont, Chapel Hill, Charlotte, Fayetteville, Greensboro, Kernersville, Lenoir, Reidsville, Rockingham, Troutman, NC

Reported 03/23/2019 12:00 AM
Project Title

Intersection and Parking Lot Improvements

Physical Address View project details and contacts
City, State (County) High Point, NC   (Guilford County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description This contract consists of providing personnel, equipment and materials to complete intersection improvements at two locations and repair and resurface three parking lots. The work consists of placing approximately 590 Tons of asphalt concrete intermediate course, 390 Tons of asphalt concrete base course, 1,160 Tons of asphalt concrete surface course, 11,600 SY of asphalt surface treatment mat coat and a variety of other items and materials including but not limited to services, traffic control, traffic signal modifications, pavement repairs and additional work necessary to complete this contract.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents