Similar Projects
Broadmoor Boulevard Extension Phase II R/W (Northern Boulevard to PDV) - City of Rio Rancho
Infrastructure
Conception
$2,650,730 CJ est. value
Rio Rancho, NM 87124

13 Judicial Complex Expansion - 38529 - Sandoval County
Addition, Demolition, Infrastructure
Conception
$11,288,000 CJ est. value
Bernalillo, NM 87004

Roadrunner Storage
New Construction, Infrastructure - 100,000 SF
Design
$5,000,000 CJ est. value
Rio Rancho, NM 87124

Tulip Townhomes
New Construction, Infrastructure
Design
$12,100,000 CJ est. value
Rio Rancho, NM 87124

Jemez Irrigation Dam Diversion Improvements
Infrastructure
Bidding
$600,000 CJ est. value
Jemez Springs, NM 87025

Installation of Bollards at the Rio Rancho Event Center
Renovation, Infrastructure
Bidding
$75,000 CJ est. value
Rio Rancho, NM 87144

Ranchitos Lift Station
New Construction
Post-Bid
Santa Ana Pueblo, NM

RFQ Contractor - El Vado Dam Spillways and Dam Crest Modification Project
Infrastructure
Post-Bid
$86,000,000 CJ est. value
Tierra Amarilla, NM 87575

Old Highway 44 Roadway and Bridge Reconstruction
Demolition, New Construction, Infrastructure
Results
$2,784,573 CJ est. value
Bernalillo, NM 87004

Deluxe Design Expansion
Addition, Infrastructure, Renovation
Construction
$1,300,000 CJ est. value
Rio Rancho, NM 87144

Melon Ridge
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Rio Rancho, NM 87124

Iris Road Drainage Improvements - City of Rio Rancho
Infrastructure
Conception
$1,700,000 CJ est. value
Rio Rancho, NM 87144

Roadrunner Self-Storage
New Construction, Infrastructure - 100,000 SF
Design
$2,000,000 CJ est. value
Rio Rancho, NM 87124

Well 13R Equipping and Site Improvements
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Rio Rancho, NM 87124

New Tank at Well 12 - City of Rio Rancho
New Construction, Infrastructure
Conception
$300,000 CJ est. value
Rio Rancho, NM 87144

Last Updated 11/28/2022 01:02 AM
Project Title

Replacement Well 9R Drilling, Completion, Development, and Pump Testing

Physical Address View project details and contacts
City, State (County) Rio Rancho, NM 87144   (Sandoval County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $3,200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Rio Rancho is requesting formal proposals for the replacement, completion, development and pump testing of a new production well to a depth of approximately 1925 feet including a 18-inch pilot hole, 18-inch stainless steel casing, sampling and testing, and the installation of a temporary low water crossing on King Road during the well development and pump testing. Project also includes plugging and abandoning the existing well 9. The Contractor shall be solely responsible for obtaining and conforming with all permits and requirements of the NMOSE for the completion of Well 9 and additional project information is located in the RFP document. This project is wholly or partially funded with United States Environmental Protection Agency funds and the Army Corp of Engineers, and therefore must comply with all federal requirements, to include the Clean Air Act, Clean Water Act/Safe Drinking Water Act, and Energy Policy and Conservation Act. Neither the United States nor its department's agencies or employees is or will be party to this invitation for bids or any resulting contract. This procurement will be subject to all applicable federal regulations including the Davis Bacon Act requirements. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex or national origin. Offerors on this work will be required to comply with the President's Executive Order No. 11246, as amended. To ensure that Disadvantaged Business Enterprises (DBEs) have the opportunity to compete for procurements funded by EPA financial assistance, all Offerors shall make the six good faith efforts as outlined by EPA. The Offeror must make a good faith effort to solicit and hire Disadvantaged Business subcontractors and suppliers to meet the goals outlined in EPA XP-215. A good faith effort requires that the Contractor: 1) Complete the affirmative steps outlined in XP-215, 2) Submit XP-215 with the bid proposal, 3) Submit with the bid proposal proof that affirmative steps have been taken and this should include copies of advertisements and letters of solicitation. A Proposal that omits XP-215 or does not support that a good faith effort was made will be considered non-responsive and the Proposal rejected. The awarded contract shall comply with the Copeland "Anti-Kickback" Act (18 U.S.C. 874).

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents