Similar Projects
Renovations to Well 2
Post-Bid
Irondale, AL 35210

Hot Water Pump Repair
Post-Bid
Montgomery, AL 36109

N--Replace Pump/Engine on Upland at Eufaula
Results
$90,000 to $110,000 est. value

N--Replace Pump/Engine on Upland at Eufaula
Results
$90,000 to $110,000 est. value

J--Chiller Plant Pump Rebuild
Post-Bid
Montgomery, AL 36109

Waste Water Treatment Six Inch Pump
Results
Less than $38,955 est. value
Alexander City, AL 35011

Contract 1 - Test Well and Gravel Filter Finish Production Well (Well No. 6 - Red Springs Well)
Post-Bid
Gilbertown, AL

New Drinking Water Well, Talladega National Forest
Results
$25,000 to $100,000 est. value
Heflin, AL 36264

Lott Road Well and Snow Road Well Replacement
Post-Bid
Citronelle, AL 36522

Chilled Water Pumps/Valves Phase 3
Results
Less than $92,955 est. value
Huntsville, AL 35801

New Water Supply Well on Pea Ridge Road in Association with Provalus
Post-Bid
Less than $1,200,000 est. value
Brewton, AL 36426

Screw Pump Replacement Phase 1
Results
Loxley, AL 36551

Water Supply Improvements (Contract B)
Post-Bid
Irvington, AL 36544

Submersible Wastewater Pumps and Dry Pit Submersible Wastewater Pumps
Term Contract
Results
Huntsville, AL 35801

Diagnose/Repair- Molnar/Houston/Upland
Post-Bid
Eufaula, AL 36027

Last Updated 04/07/2020 11:32 AM
Project Title

Rehabilitation of Shellfield Road Well No. 11

Physical Address View project details and contacts
City, State (County) Enterprise, AL   (Coffee County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $73,140
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Bid consists of two (2) Base Bid Options and an Additive Alternate. Option No. 1 consists of completing an initial pump test, pulling the existing vertical turbine pump, completing a full breakdown, inspection and pump/column assembly report, replacement of worn parts, reinstallation of the rehabilitated pump and column assembly, disinfection, and Final Pump Test. Option No. 2 consists of completing an initial pump test, pulling the existing vertical turbine pump, furnishing and installing a complete new pump and column assembly, disinfection, and Final Pump Test. Additive Alternate No. 1 consists of furnishing and installing a new electric motor.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents