Similar Projects
Homestead Phase Four
New Construction, Infrastructure - 7,900 SF
Conception
$80,000,000 CJ est. value
Logan, UT 84321

Foreign-Language Center - Utah State University
New Construction, Infrastructure
Design
$14,500,000 CJ est. value
Logan, UT 84321

Foreign-Language Center - Utah State University
New Construction, Infrastructure
Design
$14,500,000 CJ est. value
Logan, UT 84321

Lewiston City Sewer System Upgrades
Infrastructure
Bidding
$3,500,000 CJ est. value
Lewiston, UT 84320

SR-23; SR-30 to Idaho Preservation High Volume
Infrastructure
Bidding
$4,000,000 CJ est. value
Cache Jct, UT 84304

Biology and Natural Resources Building Addition and Renovation
Post-Bid
Logan, UT

Building 95, North End Remodel
Renovation
Post-Bid
Logan, UT 84341

DFCM Construction Bridgerland Technical College Health Sciences Building
New Construction
Results
$32,500,000 est. value
Logan, UT 84321

CM/GC Services BNR South Wing Phase One Curtain Wall and Seismic Upgrade
Renovation
Results
Logan, UT

Berntson Estates Residential Subdivision
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Logan, UT 84341

100 West Executive Suites
Demolition, New Construction, Infrastructure - 80,920 SF
Pending Verification
$24,400,000 CJ est. value
Logan, UT 84321

Logan Meadows Business Park
New Construction, Infrastructure - 83,560 SF
Design
$12,300,000 CJ est. value
Logan, UT 84321

RFP D/B - Providence City Skate Park
Infrastructure
Bidding
$300,000 CJ est. value
Providence, UT 84332

USU Blanding PCTE ShopKo Remodel
Renovation
Post-Bid
Logan, UT

DFCM Construction - USU Mehdi Heravi Global Teaching/Learning Center
New Construction - 38,429 SF
Results
$13,500,000 est. value
Logan, UT

Last Updated 12/07/2022 06:56 PM
Project Title

Medhi Heravi Bid Pack 1 - Utah State / Logan

Physical Address View project details and contacts
City, State (County) Logan, UT 84321   (Cache County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

Scope will include tree removal, selective demolition, grading utilities, curb & gutter, sidewalks, drive approach, landscape repairs and site electrical.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents