Similar Projects
Emerald Lakes Mixed-Use Development Master Plan
New Construction
Conception
$10,000,000 CJ est. value
Palm Bay, FL 32905

Holiday Inn Express
New Construction
Conception
Cocoa, FL

TownePlace Suites
New Construction
Design
Cape Canaveral, FL 32920

Aloft Hotel
New Construction - 82,639 SF
Design
$19,000,000 est. value
Melbourne, FL 32901

Springhill Suites by Marriott
New Construction - 74,858 SF
Post-Bid
West Melbourne, FL 32904

Purchase of Real Estate and Development of 603 Brevard Ave
Results
Cocoa, FL

Tapestry Collection by Hilton Hotel and Parking Garage
New Construction
Construction
$27,200,000 est. value
Melbourne, FL 32901

Fairfield Inn by Marriott
New Construction
Construction
$9,353,830 est. value
Melbourne, FL 32940

The Westin Cocoa Beach
New Construction, Demolition
Conception
$250,000,000 est. value
Cocoa Beach, FL 32931

Courtyard by Marriott
New Construction
Design
Titusville, FL 32780

Sunbelt Cape Hampton Inn and Home2 Suites Hotel
New Construction - 154,318 SF
Construction
Cape Canaveral, FL 32920

Extended Stay America #9505
New Construction - 53,857 SF
Construction
$8,000,000 est. value
Titusville, FL 32780

Avid Hotel
New Construction - 42,738 SF
Construction
$4,250,000 est. value
Viera, FL 32940

Home2 Suites
New Construction
Construction
$6,800,000 est. value
Melbourne, FL 32940

Extended Stay America #9511
New Construction
Construction
$8,000,000 est. value
West Melbourne, FL 32904

Last Updated 10/17/2019 03:23 PM
Project Title

Design, Construction, Operation and Management of a Hotel on Airport-Managed Property at the Orlando-Melbourne International Airport

Physical Address View project details and contacts
City, State (County) Melbourne, FL   (Brevard County)
Category(s) Commercial
Sub-Category(s) Hotel/Motel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The MAA is issuing this RFP for a qualified Development Team to enter into a long-term ground lease with the MAA for the Property on which the Development Team will design, construct, operate and manage a hotel. The Project must adhere to all applicable local and federal zoning and development laws and all applicable state and federal statutes (including the bonding requirements in Section 255.05 of the Florida Statutes), all of which must be confirmed by the Development Team. The Development Team will be responsible for all costs and expenses for the design, construction (including bonding costs), operation and management of the hotel.
Details
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents