Similar Projects
Maintenance of Seepage Control System, Waterbury Dam
Term Contract
Results
$196,885 est. value
Waterbury, VT

Fort Hill Bridge Removal, Stream Restoration and Route 15 Wildlife Passage Project
Construction
Less than $141,902 est. value
Williston, VT 05495

Camp Wihakowi Dam Removal
Demolition
Construction
Northfield, VT

Crystal Lake Dam Improvements
Results
Barton, VT

Last Updated 03/18/2021 04:10 PM
Project Title

Miles Pond Dam Improvements

Physical Address View project details and contacts
City, State (County) Concord, VT 05824   (Essex County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $120,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of, but is not limited to: The project shall consist of brushing and clearing vegetation, removing existing wood stoplogs and replacing with an aluminum stoplog system, a coffer dam and turbidity filter curtain, excavation to remove sediments from in front of the stoplogs, and excavating the southeast area below the principal spillway weir, a new catwalk, minor concrete repairs, chain link repairs, setting the buoy safety float, regulatory spar buoy, concrete anchor blocks, tree removal, sinkhole repair, turf establishment and all incidental and subsidiary work necessary to complete the project.

Details

Dam/Tunnel, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents