Similar Projects
Last Updated | 04/28/2023 11:37 AM |
Project Title | Cannery Park |
Physical Address | View project details and contacts |
City, State (County) | Eau Claire, WI 54703 (Eau Claire County) |
Category(s) | Entertainment/Recreation, Heavy and Highway, Sewer and Water |
Sub-Category(s) | Misc. Recreational, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $2,689,280 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construction of the Cannery Park shall consist of clearing trees, park building construction, playground construction, water and sewer connection, storm sewer, unclassified excavation, borrow excavation, site grading, preparation of subbase, 6-inch crushed aggregate base, concrete sidewalk, concrete and metal skate trail, electrical conduit and wiring installation, pedestrian scale light poles and base installation, concrete steps installation, pipe and tube railing installation, native grass restoration and landscaping. For questions regarding this project contact the Purchasing office, 203 S. Farwell Street, P.O. Box 5148, Eau Claire, WI 54702-5148, telephone (715) 839-4957 The work for which bids are requested consists of erosion control, clearing trees, park building construction, playground construction, water and sewer connection, storm sewer, unclassified excavation, borrow excavation, site grading, preparation of subbase, 6-inch crushed aggregate base, concrete sidewalk, concrete and metal skate trail coordination, electrical conduit and wiring installation, pedestrian scale light poles and base installation, concrete steps installation, pipe and tube railing installation, native grass restoration and landscaping. Please contact the City Purchasing Office for questions or additional information. Although a firm timeline for construction has not been determined, construction is not expected to commence prior to May 2023. |
||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |