Similar Projects
Construction of the Water Supply and Treatment Facilities
New Construction, Infrastructure
Bidding
$17,500,000 CJ est. value
Waterloo, IL 62298

Contract Documents & Specifications For 500,000 Gallon Elevated Tank
New Construction, Infrastructure
Bidding
$300,000 CJ est. value
Waterloo, IL 62298

CRS 2 Asphalt, Spread
Infrastructure
Post-Bid
Waterloo, IL

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

9.2 Miles of Patching on i-255 from the Jefferson Barracks Bridge to Il 157
Infrastructure
Results

RR-21-4821 Pavement Repairs
Infrastructure
Results

Construction of the Water Transmission Facilities
New Construction, Infrastructure
Bidding
$1,600,000 CJ est. value
Waterloo, IL 62298

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Construction of a Roundabout at Palmer Creek Road and Quarry Road in Columbia
Infrastructure
Results
IL

Waterloo Road Culvert Replacement
Infrastructure
Bidding
$600,000 CJ est. value
Waterloo, IL 62298

Bituminous Materials (Tack Coat), Hot-Mix Asphalt
Infrastructure
Post-Bid
$300,000 est. value
Waterloo, IL 62298

Roadway Resurfacing
Infrastructure
Results
Waterloo, IL

Zimmer Park Splash Pad
New Construction, Infrastructure
Post-Bid
$800,000 CJ est. value
Waterloo, IL 62298

Morrison Avenue
Infrastructure
Results
Waterloo, IL

Jimmy Johns - Veteran's Pkwy / Columbia
New Construction, Infrastructure - 1,208 SF
Post-Bid
$375,000 CJ est. value
Columbia, IL 62236

Last Updated 03/17/2023 09:08 AM
Project Title

W.J. Zahnow Elementary Addition to Parking Lot

Physical Address View project details and contacts
City, State (County) Waterloo, IL 62298   (Monroe County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $718,867 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of the Project is defined by the Contract Documents and consists of the following: General: Work of this Contract includes coordination of entire work of project, including preparation of general coordination drawings/diagrams/schedules, and control of site utilization; from beginning of activity, through project closeout and warranty periods. All work associated with addition to parking lot at W.J. Zahnow Elementary School.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents