Similar Projects
Unit No. 8 GE FS7E Exhaust Silencer Panel(S) Modifications and Repairs
Bidding
Lakeland, FL 33801

Water Fountain Replacements Citywide
Bidding
Holly Hill, FL

Ground Transportation Facility GMP 8S.1
Sub-Bidding
Orlando, FL 32827

Grizzle Building, Replace Generator, Chiller Pumps, and Air Handling Units
Post-Bid
$2,000,000 est. value
Largo, FL

Annual Control and Safety Valve Repair Services
Term Contract
Post-Bid
Lakeland, FL 33805

46--Water Purification System
Results
West Palm Beach, FL 33410

J--Copy of Service: Visn 8 Boiler Safety Device Testing, Program Development and Training
Results
Bay Pines, Cape Coral, Gainesville, Lake City, Miami, Orlando, Tampa, West Palm Beach, FL - San Juan, PR

Indian River State College Main Campus Chiller Plant Building-X Upgrades Project
Construction
Fort Pierce, FL 34981

Boiler Preventative Maintenance and Repairs
Term Contract
Bidding
FL

Directions for Living
Post-Bid
Clearwater, FL 33764

H--Service: Mechanical Backflow Prevention Evaluation (Cross Connection Survey)
Results
Bay Pines, FL 33744

Maintenance and Repair of Two Cleaver Brooks Steam Boilers
Bidding
Miramar, FL 33027

Navy Point Elementary School Chiller Replacement
Post-Bid
Pensacola, FL 32507

Water Treatment Plant Nano Filtration Membrane Replacement
Results
Hallandale, FL 33009

Commercial Refrigeration Repair Services
Term Contract
Bidding
$250,000 est. value
Bradenton, FL

Reported 10/31/2020 12:00 AM
Project Title

Rehabilitation Program - 18807 Autumn Lake Boulevard

Physical Address View project details and contacts
City, State (County) Hudson, FL 34667   (Pasco County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value Less than $10,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replace the existing air conditioning system assuming to be a 5-ton straight cool system with a new heat pump system. (Can be larger or smaller depending on energy cals.) Replace the existing air handler, condensing unit, plenums, copper, controls, and all wiring to code. New equipment to be installed in the same locations as existing. Minimum SEER required 15.00. Heat strip is a 5 KW. The exact size of the air conditioner to be determined condition contractor. New thermostat to be a setback, programmable

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents