Similar Projects
B600 Renovate USACE Conference Room
Renovation
Post-Bid
Less than $25,000 est. value
Dover, DE 19902

Simplified Acquisition of Base Engineer Requirements (SABER)
New Construction, Renovation, Addition
Post-Bid
$2,000 to $500,000 est. value
Dover, DE 19902

Office Building Renovation
Renovation - 27,000 SF
Conception
New Castle, DE 19720

EST Building Addition and Renovation at River Road Training Site
Renovation, Addition - 5,244 SF
Results
New Castle, DE

East Field Office Large Term Multiple Award IDIQ for Construction Services with Design Build Capabilities
Results
$30,000 to $3,000,000 est. value

East Field Office Large Term Multiple Award IDIQ for Construction Services with Design Build Capabilities
Results
$30,000 to $3,000,000 est. value

East Field Office Large Term Multiple Award IDIQ for Construction Services with Design Build Capabilities
Results
$30,000 to $3,000,000 est. value

Scannell Readiness Center-Second Floor Restroom Improvements
Renovation
Results
Delaware City, DE 19706

Building 153 Renovation
Renovation - 6,808 SF
Bidding
Bethany Beach, DE 19930

Last Updated 02/01/2022 08:56 AM
Project Title

Design/Build Contract Services for Transient Training Officer Barracks Building

Physical Address View project details and contacts
City, State (County) Bethany Beach, DE   (Sussex County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,500,000 to $5,000,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Construction of a Transient Trainging Officer Barracks Building, not to exceed 12,000 square feet, supporting the Level 5 Intermediate Training Site requirements for the DEARNG. The barracks includes the following item; personal operated vehicle parking (paved), geothermal, and photovoltaic. This facility will be designed to meet industry standards, as well as all local, State, and Federal building codes and per Public Law 90- 480. Project will be designed to meet LEED Silver Certification. 2. onstruction will include all utility services, information systems, fire detection and alarm systems, roads, walks, curbs, gutters, storm drainage, parking areas, and site improvements. Facility will be designed to a minimum like of 50 years in accordance with DoDs Unified Facilities Code (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance per ASA (IE&E) Sustainable Design and Development Policy Updated, Dec 2013. Access for individuals with disabilities will be provided. Antiterrorism measures in accordance with the DoD Minimum Antiterrorism for building standards will be provided.

Details

Military Facility, 12,000 SF New Construction.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents