Kimball Avenue Shared Use Path (Phase 2) - City of South Burlington
Infrastructure, Alteration
Conception
$400,000 est. value
South Burlington, VT 05403

Poor Farm Road 8" Waterline - 500-057-P - Town of Milton
Infrastructure
Conception
$2,900,000 CJ est. value
Milton, VT 05468

Residence Inn By Marriott / Burlington
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Burlington, VT 05401

Winooski Avenue Apartment Building
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Burlington, VT 05401

RFQ Construction Manager - Public Works Facility
New Construction, Infrastructure - 30,000 SF
Post-Bid
$500,000 CJ est. value
Milton, VT 05468

2022 Sawmill Road Ditching Project
Infrastructure
Post-Bid
$160,000 CJ est. value
Essex Jct, VT 05452

Retainer Contracts for Statewide Site and Earthwork Services
Term Contract
Results
$150,000 est. value

Extend Taxiway G and Construct New General Aviation South Apron
Infrastructure
Results
$6,149,518 CJ est. value
South Burlington, VT 05403

Shelburne Green South
New Construction, Renovation - 70,600 SF
Construction
$3,029,100 est. value
Shelburne, VT 05482

Founder's Hall Demolition, New Walkways, and Lawn Area
New Construction, Demolition
Construction
$715,000 est. value
Colchester, VT

Tarrant Event Center - University of Vermont
Addition, Renovation, Infrastructure - 114,012 SF
Pending Verification
$95,000,000 CJ est. value
Burlington, VT 05405

Blakely Road Residential
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Colchester, VT 05446

Spear Street Residential Development
Demolition, New Construction, Infrastructure
Conception
$18,900,000 CJ est. value
South Burlington, VT 05403

Safe Harbor Shelburne Shipyard Expansion
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Shelburne, VT 05482

RFQ Construction Manager - Milton DPW Highway Facility Project
Infrastructure - 30,000 SF
Post-Bid
$5,000,000 CJ est. value
Milton, VT 05468

Last Updated 10/12/2022 11:37 AM
Project Title

UPDATE MUNI - Site Plan - Industrial - Allen Brook Development, Inc.

Physical Address View project details and contacts
City, State (County) Williston, VT 05495   (Chittenden County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Design Development
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rezoning plan for Taft Corners draws mixed responses from residents, developers illiston residents have a lot to say about the town's plan to rezone its central shopping area, Taft Corners. Streetscape, walkability, housing, building height, traffic and parking are among the issues they brought up at a Tuesday meeting attended by roughly 80 people. Town officials hope to redesign what is now a busy shopping center with big-box stores and parking lots into a walkable, bike-friendly neighborhood with housing, shops and block-style streets with trees and parks. It would replace the existing commercial, residential and industrial districts with mixed-use development. After two years of work, the planning commission submitted a new form-based code proposal to the Selectboard for the 1,000-acre area around the intersection of Routes 2 and 2A and the Exit 12 interchange at Interstate 89. The proposed zoning amendment allows for higher buildings and greater density. Residents also want livable, affordable housing and a diverse, walkable neighborhood with an attractive streetscape, said Matt Boulanger, the town's planning director. A public hearing on the proposed zoning code drew more than 30 residents in person and about 50 virtually at Tuesday's Selectboard meeting. Many more submitted letters to the Selectboard. "It's good to have the community engaged over these discussions," Town Manager Erik Wells said, calling it a "really good turnout." Many residents approved of the form-based code supporting "a design-conscious downtown with a strong pedestrian orientation," as Boulanger described in a letter to the board. This type of code puts more emphasis on creating requirements for the physical appearance of buildings, rather than dictating their uses. Others opposed the idea, including the three biggest developers in the area. In letters to the board, representatives from the Taft Corners Associates (developer of Taft Corners Park), Allen Brook Development (owner of Cottonwood Crossing) and Snyder Homes (developer of Finney Crossing) urged the town to reconsider the proposed rezoning. Jeffrey David and Jeffrey Nick of the Tafts Corners Associates wrote on June 2 that the process using an outside consultant and a limited survey has been flawed and that the draft zoning amendment "will harm existing businesses, discourage new development and ultimately weaken the Taft Corners tax base." Alfred Senecal of Allen Brook Development who owns an 80-acre parcel that would be impacted by the rezoning wrote in a June 3 letter that he shares the town's vision of a vibrant mixed-use development, but said it's an expensive option that would drive up the cost of development. "I believe this plan is well intentioned but has just missed the mark," Senecal wrote. Chelsea Place resident Andy Patterson wrote to the board to say he strongly supports the new code but hopes it won't look like the Finney Crossing development. "I am astounded ... the developers have the temerity to insist that they have the right to continue building a dysfunctional community. Actions have consequences, and the developers of Finney Crossing have by their actions necessitated that we raise the bar," he said. In a similar vein, Carol Burbank, who has lived in town for almost 55 years, said, "I hope consideration can be made for the benefit of the people that live here and not what the developers wish." Some residents, however, are concerned about density and do not want to see buildings that are three to five stories high. Jacqueline Ward wrote to say she is all for "lovely housing" but not for turning Williston "from a town into a city with large buildings." Tim and Marla McQuiston, who bought a house in Williston in 1996, said they are in favor of the code but could not afford to buy there today. They hope the new zoning will encourage affordable housing and build "communities of accessible and comfortable homes for mixed ages, retirees, people with disabilities and young families, with parks and services within easy walking distance." The Selectboard expects to make a decision on the proposed amendments in the coming weeks. Any substantial changes would require another public hearing before they can be adopted. Since at least 1990, the town plan has called for Taft Corners to be a "vibrant, mixed use downtown area with a strong pedestrian orientation." A vision plan created in 2021 identified several elements after a series of public meetings. To make that a reality, however, the town will need to do more than change its zoning. For example, Williston faces some significant limitations in wastewater treatment capacity, according to Boulanger, and the redesign would have to take that into consideration. As the Selectboard considers the public comments received so far, the main challenge is to balance different interests, according to Chair Terry Macaig. "Some people are totally on board with what's been proposed. Others are totally opposed. Then there are people in the middle who have some suggestions. We seem to see a number of people who are opposed to the higher buildings that are being proposed for that area. So that'll be a major consideration that we'll be taking a look at," he said. Boulanger said he is excited to see what plans are proposed for new buildings. "We have had some sort of cautious interest by property owners in the district who are imagining developing or redeveloping a lot under this code," Boulanger said. And it's been interesting to hear from landowners, architects, engineers about what they are imagining under the new set of rules proposed, he added. "It's really fun to spend a morning looking at a real site in Taft Corners and then imagining the building that might be there someday and what that might do for the community," Boulanger said. ____________________ Project ID: 3800782 Site Plan Amendment-Public Hearing-Al Senecal d/b/a Allen Brook Development Inc.: Proposal to increase the previously approved 36,000 sq. ft. building to 43,200 sq. ft., including site improvements for property located at 131 Red Pine Circle in the Resource Preservation-Industrial District (RPD-I). Tax Map 72, Parcel 12, Lot 5. 6. Site Plan-Public Hearing: Al Senecal d/b/a Allen Brook Development Inc., is proposing a 20,000 sq. ft. commercial/industrial building on Lot 6, 65 Red Pine Circle in the Resource Preservation District-Industrial (RPD-I) Zone. Tax Map 72, Parcel 12, Lot 6.

Details

,, 63,200 SF - 43,200 SF. 20,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents