Last Updated 07/29/2022 11:37 AM
Project Title

USDA Water Main Improvements in the Bogue Chitto Area, including Hwy. 22 WTP Filter Rehabilitation

Physical Address View project details and contacts
City, State (County) Grand Bay, AL 36541   (Mobile County)
Category(s) Government/Public, Single Trades
Sub-Category(s) Library - Public, Roofing
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Plans and specifications are for viewing purposes only and in order to be considered an official bidder contractors must obtain plans and specifications from Goodwyn Mills & Cawood Inc. Removal and replacement of low slope roofing systems, eave flashings, deteriorated roof decking, installation of new roof decking as required, installation of underlayment and self-adhering flashings, metal flashing, SBS roofing system as indicated on the drawings and all associated work required to provide a complete, functioning, weatherproof and warrantable project Sixty (60) calendar days are allowed for the construction of the project. All bids must be on blank forms provided in the Specifications and submitted in its entirety. The cost of and return of additional sets of Specifications shall be in accordance with Section 39-2-3 in the code of Alabama 1975. No specifications will be issued to contractors later than Twenty-Four (24) hours prior to the time indicated above for receiving bids. A cashier's check drawn on an Alabama bank or a Bidder's Bond, payable to Mobile County, Alabama, for an amount not less than Five Percent (5%) of the amount bid, but in no event, more than Ten Thousand ($10,000) Dollars, shall be filed with the proposal, the Bidder's Bond being prepared on the form specified and signed by a bonding company authorized to do business in the State of Alabama. A Performance Bond in the form and terms approved by the County in an amount not less than the contract price will be required at the signing of the contract. A labor and materials bond in form and terms approved by the County in an amount not less than the contract price, insuring payment for all labor and materials, shall also be required at the signing of the contract The right is reserved to reject any and/or all bids, waive informalities, and furnish any item of material or work to change the amount of said Contract

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Roof and Deck Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Library Equipment, Library Stack Systems, Audio-Visual Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Institutional Furniture, Library Furniture, Book Shelves, Study Carrels, Index Card File Cabinets, Portable Audience Seating, Seat and Table Assemblies.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents