Similar Projects
Blue Ridge Parkway
Post-Bid
$85,000,000 est. value

Yard Asphalt Re-Surfacing and Expansion Project
Post-Bid
Southern Pines, NC

Asphalt Surface Treatment on 14 Sections of Secondary Routes and Laytex Modified Microsurfacing, Type III
Results
NC

Milling and Resurfacing
Results
NC

Bituminous Plant Mix Asphalt
Term Contract
Post-Bid

Milling and Resurfacing
Infrastructure
Results
NC

2022 Annual Street Resurfacing and Improvements Project
Term Contract
Post-Bid
Pinehurst, NC

Clearing and Grubbing, Erosion Control, Resurfacing and Shoulder Grading
Infrastructure, Alteration
Results

Connector Road
Infrastructure
Post-Bid
Carthage, NC 28327

2022 Crack Seal Moore
Infrastructure
Results
NC

2021/2022 Street Resurfacing
Infrastructure
Post-Bid
Southern Pines, NC

Milling, Resurfacing and Shoulder Grading
Infrastructure
Results
NC

Paving Project
Infrastructure
Post-Bid
$200,000 est. value
Carthage, NC 28327

Grading, Drainage, Paving, and Culvert
Infrastructure
Results
NC

Utility Construction and Paving
Infrastructure
Post-Bid
$3,000,000 est. value
Aberdeen, NC 28315

Last Updated 05/24/2022 10:06 AM
Project Title

2022 Paving Improvements Project

Physical Address View project details and contacts
City, State (County) Robbins, NC   (Moore County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of improvements to the following streets: Base Bid: Forest Heights Neighborhood: Streets included are Forest Dr, Timber Ln, Dogwood St, and Pine St. Total street length is approximately 3,840 LF with varying street widths of 16’ to 22’ wide. Work includes pavement base repair, asphalt surface treatment (AST), resurfacing, minor ditch work, traffic control, minor shoulder work, and seed and mulch. Elm Street: Total street length is approximately 380 LF, width varies from 20’ to 34’ wide, with parking lane. Work includes pavement base repair, asphalt surface treatment (AST), and resurfacing. The Project offers Contractors an alternate bid, Alternate Bid #1, option for improvements: Alternate Bid #1 Forest Heights Neighborhood: Streets included are Forest Dr, Timber Ln, Dogwood St, and Pine St. Total street length is approximately 3,840 LF with varying street widths of 16’ to 22’ wide. Work includes full-depth reclamation (FDR), resurfacing, minor ditch work, traffic control, minor shoulder work, and seed and mulch.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents