Similar Projects
SR 385 at Hazel Creek in Demorest
Demolition, New Construction, Infrastructure
Design
$4,000,000 CJ est. value
Clarkesville, GA 30523

SR 385 at Hazel Creek in Demorest
Demolition, New Construction, Infrastructure
Design
$4,000,000 CJ est. value
Clarkesville, GA 30523

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Agriculture Meter Installation
Infrastructure
Results

Keller Road Water Line
Infrastructure
Results
$116,096 est. value
Mount Airy, GA

SR 105 at SR 115
Infrastructure
Design
$3,000,000 CJ est. value
Demorest, GA 30535

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

Church Street, Ivory Drive, and Lenora Lane Roadway Improvements
Infrastructure
Results
Baldwin, GA 30511

RFP D/B - Purchase and Installation of a Three Classroom Modular Building at Gnets/Futures Campus
Renovation, Infrastructure
Post-Bid
$250,000 CJ est. value
Cornelia, GA 30531

Chandler Heights Subdivision Roadway Improvements
Infrastructure
Results
Baldwin, GA 30510

LMIG 2022-1 (137) - Milling, Patching, Leveling, and Resurfacing on 19 Various Roads
Infrastructure
Post-Bid
$2,000,000 est. value
Clarkesville, GA

Water Monitoring
Infrastructure
Results
Mount Airy, GA

Placement of Asphalt Plant Mix
Infrastructure
Post-Bid
$100,000 est. value
Clarkesville, GA

FY 2021 CDBG Multi Area Infrastructure Improvements
Infrastructure
Results
$834,495 CJ est. value
Cornelia, GA 30531

Last Updated 02/01/2023 10:32 PM
Project Title

Market Corners Drive Improvements

Physical Address View project details and contacts
City, State (County) Cornelia, GA 30531   (Habersham County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $487,915 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be completed shall consist of labor, equipment, and materials required to complete approximately 1,400 linear feet of full depth road reclamation, 570 linear feet of concrete sidewalk and associated curb and gutter storm improvements along with all appurtenances necessary for a complete installation. Time allotted for completion of work is 90 calendar days. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract. Offerors must complete the Qualifications of Offeror (Section 00470) in order to be evaluated for award of the Contract. Refer to the specific requirements outlined in the referenced Section. Bids shall be accompanied by a bid bond or certified cashier's check in an amount not less than 10% of the base bid. All bonds shall be by a surety company licensed in Georgia with an "A" minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of "Best's Key Rating Guide Property Liability". Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful bidder if contract is awarded. Each Bond shall be accompanied by a "Power of Attorney" authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond. No Bid may be withdrawn after the closing time for the receipt of Bids for a period of sixty (60) days except as specifically provided in the Instructions to Offerors and/or by State Law. No pre-bid meeting will be held for this project. All qualifying Contractors and Subcontractors performing work with the City of Cornelia must register and participate in the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, to verify the work eligibility information of new employees. In order for a Bid to be considered, it is mandatory that the Offeror's Affidavit of Compliance with O.C.G.A. 13-10-91 be completed and submitted with the Bid. Easement and right-of-way acquisition has been completed. Funding is to be provided by local funds. Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Offeror if Owner believes that it would not be in the best interest of the Project to make an award to that Offeror, whether because the Bid is not responsive or the Offeror is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents