Similar Projects
Fox Hill Elementary School
Renovation - 85,386 SF
Design
Less than $13,420,000 est. value
Indianapolis, IN 46228

Centralized Service Center (Former Northview MS)
Renovation, Demolition - 292,340 SF
Design
Less than $18,800,000 est. value
Indianapolis, IN 46200

Lynhurst 7 and 8 Center Pool and Equipment Renovation
Renovation
Bidding
$2,000,000 est. value
Indianapolis, IN 46241

Lawrence Township High Schools Site Improvements
Infrastructure
Sub-Bidding
$400,000 CJ est. value
Indianapolis, IN 46256

Greenbriar Elementary School
Renovation, Addition
Post-Bid
Less than $13,630,000 est. value
Indianapolis, IN 46260

Nora Elementary School
Renovation, Addition - 91,334 SF
Post-Bid
Less than $13,870,000 est. value
Indianapolis, IN 46240

Lawrence North High School and Lawrence Central High School
Renovation, Addition
Results
Indianapolis, IN 46256

Lincoln Middle School Music Room Remodel
Renovation
Results
Indianapolis, IN

Community and Education Center and Hilltop PK and Preschool
Renovation, Addition - 68,050 SF
Construction
Less than $19,398,000 est. value
Indianapolis, IN 46200

Cardinal Ritter High School
Renovation, Addition - 3,675 SF
Construction
Indianapolis, IN 46222

Northview Middle School & Athletic Fields
New Construction
Post-Bid
Less than $72,187,000 est. value
Indianapolis, IN 46200

Westfield Early Childhood Center and Central Administration Building Bid Package 2
Results
Indianapolis, IN 46214

Westlake Elementary and McClelland Elementary
Renovation
Post-Bid
Indianapolis, IN 46241

Pleasant Run Elementary School
Renovation, Addition
Results
Indianapolis, IN 46219

North Central High School Central Plant and Auditorium
Renovation
Post-Bid
Indianapolis, IN 46240

Last Updated 07/24/2022 11:23 PM
Project Title

IPS Chiller Replacements

Physical Address View project details and contacts
City, State (County) Indianapolis, IN 46204   (Marion County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $60,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Owner reserves the right to accept or reject any Bid, to waive any informalities or errors in bidding for a period of sixty (60) days after the Bid opening.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Schedules for HVAC, Schedules for Central Cooling Equipment, Packaged Water Chiller Schedule, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Packaged Water Chillers.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Chillers and Coolers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents