Similar Projects
County Dirt Road Improvements - Belmont Drive
Post-Bid
Cheraw, SC 29520

County Dirt Road Paving Project Improvements -Meeting Street
Post-Bid
Cheraw, SC 29520

Preservation - District 4
Results

Paving At Mcbee High School
Results
Less than $223,754 est. value
McBee, SC 29101

Road Improvements - West Sutton Street
Post-Bid
Pageland, SC 29728

Paving At Central High School
Results
Pageland, SC 29728

Asphalt Paving Belmont Drive
Post-Bid
Chesterfield, SC 29709

Paving At Cheraw High School
Results
Less than $469,898 est. value
Cheraw, SC 29520

Reconstruction/Rehabilitation - District 4
Post-Bid

Intersection Improvement at US 601/SC 9
Results
SC

Asphalt Paving Mcdonald Circle
Results
Chesterfield, SC 29709

Reconstruction - Chesterfield County
Results
SC

Paving - Chesterfield
Term Contract
Results
Chesterfield, SC 29709

Reconstruction - Chesterfield County
Results
SC

Dist 4 On-Call Lane Closure
Term Contract
Results

Last Updated 06/18/2021 10:47 AM
Project Title

Construction of Entrance Roadway and Stormwater Master Planning

Physical Address View project details and contacts
City, State (County) Pageland, SC 29728   (Chesterfield County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of providing all required materials, equipment, and labor necessary to complete the construction of Entrance Roadway and Stormwater Master Planning ± 139-Acre Lynches River Industrial Park on Dove Sutton Road (S-682) Chesterfield County, South Carolina. The Roadway, and Stormwater Improvements includeclearing, grubbing to construct approximately 2,620 Linear Feet (LF) of Two (2) Fifteen (15)-foot Lanes with shoulder and ditch section, storm drainage systems, and nine (9) detention basins for future development, erosion control measures, and grass disturbed areas.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents