Similar Projects
Last Updated | 06/18/2021 10:47 AM |
Project Title | Construction of Entrance Roadway and Stormwater Master Planning |
Physical Address | View project details and contacts |
City, State (County) | Pageland, SC 29728 (Chesterfield County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Storm/Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work consists of providing all required materials, equipment, and labor necessary to complete the construction of Entrance Roadway and Stormwater Master Planning ± 139-Acre Lynches River Industrial Park on Dove Sutton Road (S-682) Chesterfield County, South Carolina. The Roadway, and Stormwater Improvements includeclearing, grubbing to construct approximately 2,620 Linear Feet (LF) of Two (2) Fifteen (15)-foot Lanes with shoulder and ditch section, storm drainage systems, and nine (9) detention basins for future development, erosion control measures, and grass disturbed areas. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |