Similar Projects
Chestnut and Grace Water Rehabilitation - 162 - Cape Fear Public Utility Authority
Infrastructure
Conception
$1,500,000 CJ est. value
Wilmington, NC 28403

Gordon Road Interconnection with NCDOT - 165 - Cape Fear Public Utility Authority
Infrastructure
Conception
$1,000,000 CJ est. value
Wilmington, NC 28411

Northern Regional Pump Stations and Force Mains, Phase A
Infrastructure
Design
$817,675 CJ est. value
Wilmington, NC 28406

Northern Regional Pump Stations and Force Mains, Phase A
Infrastructure
Design
$817,675 CJ est. value
Wilmington, NC 28406

Construction of the Installation of Intermodal RPM Lane, North Carolina State Ports Authority, Port of Wilmington
Infrastructure
Bidding
$800,000 CJ est. value
Wilmington, NC 28403

RFQ Engineering - Bridge Design Services - Spans Over 200 Feet
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Wilmington, NC 28403

Maintenance Dredging of the Atlantic Intracoastal Waterway (AIWW) North Channel
Infrastructure
Sub-Bidding
$25,000,000 CJ est. value
Wilmington, NC 28403

Randall Library Expansion and Renovation Package C
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$2,000,000 CJ est. value
Wilmington, NC 28403

Design Build Services for Mott`s Creek Pump Station Upgrades
New Construction
Post-Bid
Less than $5,900,000 est. value
Wilmington, NC 28412

Limited Construction Services Contract - Civil/Sitework
Term Contract, Infrastructure
Post-Bid
Wilmington, NC

Pump Station #34 and #35 Aesthetic Improvements
Results
$195,000 to $200,000 est. value
Wilmington, NC 28403

Kings Bluff Raw Water Pump Station Auxiliary Power Source
Results
$735,000 to $740,000 est. value
Wilmington, NC

Chair Road Waterline Extension
New Construction
Construction
$500,000 est. value
Castle Hayne, NC 28429

RFQ Engineering - River Road Booster Pump Station and Waterline Interconnection
New Construction, Infrastructure
Pending Verification
$394,402 CJ est. value
Wilmington, NC 28412

RFQ Engineering - River Road Booster Pump Station and Waterline Interconnection
New Construction, Infrastructure
Pending Verification
$394,402 CJ est. value
Wilmington, NC 28412

Last Updated 07/28/2022 01:07 PM
Project Title

Pump Station -35 Force Main Redirect and Junction Box Rehabilitation

Physical Address View project details and contacts
City, State (County) Wilmington, NC 28403   (New Hanover County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

By redirecting a major force main from a manhole to a large junction box with odor treatment, the PS-35 Force Main Redirect and Junction Box Rehabilitation corrects conditions at the Bradley Creek Pump Station that may be contributing to excess odor at the station and rehabilitates or replaces onsite manholes and mains that are past their lifecycle. As of July 28, 2022, this project is included in the Cape Fear Public Utility Authority's FY 2023-2032 CIP and funding is allotted for FY 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents