Similar Projects
Last Updated | 04/21/2022 07:33 AM |
Project Title | Drainage Rehabilitation and Sliplining Mileposts |
Physical Address | View project details and contacts |
City, State (County) | State-Wide: NJ |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage, Traffic Signalization |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The principal items of work include: Excavation 20,525 C.Y. Embankment 11,360 C.Y. Riprap 740 Ton CCFRPM Slipliner 2,110 L.F. Cured In Place Pipe Liner 2,160 L.F. HDPE Pipe 3,625 L.F. Reinforced Concrete Pipe 3,975 L.F. Inlet and Manhole Reconstruction 40 Each Construction Driveway 3,850 Ton Reinforcement Steel 4,220 LB Plantings 6,593 Each Maintenance and Protection of Traffic Various Units |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |