Similar Projects
Liberty Center Multi-Family
New Construction
Conception
Liberty Township, OH

Five Points Intersection - Butler County
Infrastructure
Conception
$2,458,000 CJ est. value
Hamilton, OH 45011

Riverside Homes Complex
New Construction
Design
Hamilton, OH 45011

Mercy Health-Fairfield Hospital Campus Expansion
Addition, Demolition, New Construction, Infrastructure - 30,000 SF
Design
$20,000,000 CJ est. value
Fairfield, OH 45014

Ramp Expansion Between Jets Hangar and Safe Skies
Infrastructure
Bidding
$269,756 CJ est. value
Middletown, OH 45042

Ramp Expansion Between Jets Hangar and Safe Skies
Infrastructure
Bidding
$269,756 CJ est. value
Middletown, OH 45042

South Union Road Roadway Improvements and Water Main Extension Project
Infrastructure
Post-Bid
Middletown, Monroe, OH 45044

Shannon Ridge - Cherokee Park Pedestrian Path
Renovation, Infrastructure
Post-Bid
$82,282 est. value
OH

Roadway Improvements
Results
$392,597 est. value
Trenton, OH 45067

2021 Street Maintenance and Repair Program
Results
$856,016 est. value
Powell, OH

The Residences at Clocktower
New Construction
Construction
West Chester, OH 45069

The Residences at Clocktower
New Construction
Construction
West Chester, OH 45069

Towne Mall Galleria / Middletown Multi-Purpose Entertainment Venue
Demolition, New Construction, Infrastructure - 492,200 SF
Pending Verification
$280,000,000 CJ est. value
Middletown, OH 45005

Towne Mall Galleria / Middletown Multi-Purpose Entertainment Venue
Demolition, New Construction, Infrastructure - 492,200 SF
Pending Verification
$280,000,000 CJ est. value
Middletown, OH 45005

Middletown Community Center - City of Middletown
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
Middletown, OH 45044

Last Updated 03/22/2023 09:42 AM
Project Title

Middletown Multi-Residential

Physical Address View project details and contacts
City, State (County) Middletown, OH 45044   (Butler County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Park/Playground, Paving/Reconstruction, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Construction start expected June 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $90,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for an apartment development that proposes ten (10) twenty-four (24) unit residential buildings, clubhouse, pool, outdoor recreational area, and dog park. As of March 22, 2023, this project has been approved by city planning and is currently in construction documents phase. An architect has been assigned. Neither a general contractor nor a selection method has been disclosed. A construction timeline has not yet been established.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Special Purpose Lighting, Underwater Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents