Similar Projects
Airport Airfield, Terminals, Ground Access Infrastructure
Renovation, Alteration
Conception
San Antonio, TX

Burbank High School - 2020 Bond - Category 2 - San Antonio Independent School District (SAISD)
New Construction, Renovation, Infrastructure
Design
$19,318,760 CJ est. value
San Antonio, TX 78205

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Clearwater Creek Phase 1A Single-Family Residential Development - Water, Sanitary Sewer, Street and Drainage Improvements
New Construction
Post-Bid
Marion, TX 78124

2018 Street Bond Projects - Phase II
Infrastructure
Post-Bid
$1,900,000 CJ est. value
Kirby, TX 78219

Somerset K - Street Phase II Reconstruction
Results
$268,298 est. value
Somerset, TX 78069

Dangerous Premises Abatement Lot Clearing and Securing of Structures
Results
$436,594 est. value
San Antonio, TX

Nicha's Comida Mexicana
New Construction, Infrastructure - 7,805 SF
Pending Verification
$2,000,000 CJ est. value
San Antonio, TX 78214

Nicha's Comida Mexicana
New Construction, Infrastructure - 7,805 SF
Pending Verification
$2,000,000 CJ est. value
San Antonio, TX 78214

Westlakes FM 143 Water Main Extension
Infrastructure
Bidding
San Antonio, TX 78252

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

Thea Meadows Unit 4 Subdivision
Results
San Antonio, TX 78275

Preserve at Medina, Unit 3 and Watson Road Single-Family Residential Development Construction of Water, Sanitary Sewer, Streets, Drainage and Traffic Signal Improvements
Infrastructure
Post-Bid
San Antonio, TX 78073

Annual Contract for Ductile Iron Pipe
Results
San Antonio, TX 78275

Last Updated 12/06/2022 06:25 PM
Project Title

Site Development Culebra and Ranch View West

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78254   (Bexar County)
Category(s) Heavy and Highway, Sewer and Water, Single Trades
Sub-Category(s) Environmental, Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Bids by Invitation
Project Status Sub-Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Negotiating General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: Site development and infrastructure to include, but not limited to erosion control, site clearing, earthwork, utilities (water, sanitary sewer, storm drainage), re-vegetation, concrete paving, pavement markings. Project Status: Awarded to Workman (Negotiated Project) - Accepting Subcontractor/Supplier Quotes Please forward all questions in writing to tthrift@workmancommercial.com.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents