Similar Projects
Central Virginia Regional Jail
Renovation, Infrastructure
Conception
$16,900,000 CJ est. value
Unionville, VA 22567

Expand GA Apron - A1033 - Orange County
Infrastructure
Conception
$1,000,000 CJ est. value
Orange, VA 22960

Rappahannock Rapidan Community Services Property
Demolition, New Construction, Infrastructure - 27,660 SF
Design
$8,000,000 CJ est. value
Orange, VA 22960

RFQ Contractor - Phlipott Landslide Construction
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bassett, VA 24055

Virginia State University Academic Commons Building Project
Demolition, Renovation, Infrastructure - 174,000 SF
Post-Bid
$100,000,000 CJ est. value
Petersburg, VA 23803

Multi-Use Trail Construction Projects
Infrastructure
Results
$400,000 CJ est. value
Hillsboro, VA 20132

Town Hall Parking Lot Renovations
Infrastructure
Results
$300,000 CJ est. value
Gordonsville, VA 22942

Germanna Heights TM 12-42H
New Construction, Infrastructure - 9,282 SF
Pending Verification
$2,500,000 CJ est. value
Locust Grove, VA 22508

Roger Scott Poultry House
New Construction, Infrastructure
Pending Verification
$11,000,000 CJ est. value
Montford, VA 22960

RW 8 Obstruction Removal (Construction) - A1020 - Orange County
Infrastructure, Renovation
Conception
$600,000 CJ est. value
Orange, VA 22960

Blue Heron Landing Park
Infrastructure
Post-Bid
$775,000 CJ est. value
Chesapeake, VA 23464

T-Hangar A Taxilane - A1026 - Orange County
Infrastructure
Conception
$680,000 CJ est. value
Orange, VA 22960

Marshall Heights Water Tank Improvements
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Orange, VA 22960

T-Hangar A - A1027 - Orange County
Infrastructure
Conception
$800,000 CJ est. value
Orange, VA 22960

Lake of the Woods 10th Hole Project
Infrastructure
Post-Bid
$500,000 CJ est. value
Locust Grove, VA 22508

Last Updated 12/20/2023 12:10 PM
Project Title

Well Installation and Spring Abandonment

Physical Address View project details and contacts
City, State (County) Gordonsville, VA 22942   (Orange County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $75,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Well Installation and Spring Abandonment (2022-NWR-23) Additional questions: Contact Angelica Cipara via email: angelica.cipara@vdh.virginia.gov The contractor shall furnish all labor, supervision, equipment, tools, parts, supplies and materials, as necessary, to perform the services as described herein: Cost for Line Item #1 (include total cost for items A-I). These are known factors. Vendors must invoice for actual cost incurred as described herein. The initial bid should be an average cost/foot of depth for 150 feet (add other itemized costs such as mobilization/setup, etc.). Please note: 150 feet is an estimate, vendor will bill based on actual service performed, actual depth drilled (as verified on the GW-2 and VDH's Record of Inspection). Vendor will only be paid for actual well depth drilled, casing depth, grout depth, depth of drop pipe, pump, etc. Vendor must provide a detailed bid for 150 ft., any additional footage must be listed as additional services at a per foot rate. Vendors who submit bids for over or under 150 feet; will not be accepted

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents