Similar Projects
Chattahoochee River Intake Pump Station
Bidding
Atlanta, GA 30303

Blanchard Water Treatment Plant Lift Station
Bidding
Evans, GA 30809

Laurel Island Parkway Lift Station
Post-Bid
Kingsland, GA

7th Street Utility Improvements Phase 2
Post-Bid
Rincon, GA

Kroger Lift Station Upgrade Project
Results
Dawsonville, GA 30534

Blanchard Water Treatment Plant Pump and Motor
Results
Evans, GA 30809

Rocky Creek Trunk Sewer Pumping Station
Construction
Augusta, GA 30900

WWTP Improvements and Glynn Addy Pump Station Rehabilitation
Construction
$3,500,000 est. value
Stockbridge, GA

Horseleg Creek Sanitary Sewer Pump Station Addition
Bidding
Rome, GA 30161

US 301 South Lift Station Rebuild
Post-Bid
Jesup, GA

Lift Station Bypass Project
Results
Albany, GA

Brooks Road Pump Station Improvements
Bidding
Lawrenceville, GA 30045

Wastewater Collections and Lift Station System Upgrades
Post-Bid
Social Circle, GA 30025

Phase I Entrance Road
Results
Savannah, GA 31400

Coke Oven Booster Pump Station Replacement
Bidding
Flintstone, GA 30725

Reported 07/17/2019 12:00 AM
Project Title

Lift Station 5 and Lift Station 7 Upgrades

Physical Address View project details and contacts
City, State (County) Griffin, GA 30223   (Spalding County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description The conversion of two existing “can” type lift stations to a wet well system with submersible pumps. This project will be a complete re-build of the two stations and components except for the existing 8-foot diameter concrete wells. The rehabilitation work on the lift stations will consist of a complete demolition of the existing components and electrical system leaving the existing 8-foot diameter concrete well for future use. The well will be cleaned and lined for the conversion of each station to a duplex submersible pump type lift station. The reconstruction will include new submersible pumps, valve pit and related components, connection of electrical service, pump control panel with VFD drives, and a new backup generator. The project will require complete bypass pumping of the influent to the stations for the duration of the construction.
Details
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents