Similar Projects
Installation of 1600 Ft of Ductile Iron Water Main
Infrastructure
Bidding
$400,000 est. value
Cohasset, MA

Installation of 6-Inch to 10-Inch Cement Lined Ductile Iron Water Mains
Post-Bid
Less than $1,400,000 est. value
Plainville, MA 02762

Washington Street and Bugbee Street Water Main Improvements
Post-Bid
Plainville, MA 02762

Canton Street Water Main
Results
Less than $1,200,000 est. value
Dedham, MA

Miscellaneous Water and Sewer Supplies
Term Contract
Results
Less than $300,000 est. value
Needham, MA

Holliston and Brentwood Street Water Main Improvements - Contract 2
Post-Bid
Less than $2,600,000 est. value
Medway, MA 02053

2020 Water Main Improvements Contract 1
Results
Less than $3,800,000 est. value
Canton, MA

Holliston and Brentwood Street Water Main Improvements - Contract 1
Post-Bid
Less than $3,200,000 est. value
Medway, MA 02053

Lincoln Street Waterline Improvements
Results
Less than $1,292,535 est. value
Franklin, MA 02038

Installation of 3 Water Fill Stations
Post-Bid
Less than $12,000 est. value
Cohasset, MA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Supply and Delivery of Water Materials and Meters
Term Contract
Post-Bid
Franklin, MA

Water Main
Results
Less than $950,000 est. value
Milton, MA

2020 Pump Station Improvements Project - General Bids
Post-Bid
$1,250,000 est. value
Weymouth, MA

CY2020 Water Main Contract No. 1
Results
Less than $3,600,000 est. value
Quincy, MA

Last Updated 07/07/2021 10:56 AM
Project Title

Pump Repair and Maintenance Drinking Water Stations and Waste Water Pumping Stations

Physical Address View project details and contacts
City, State (County) Stoughton, MA   (Norfolk County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This work includes adjustment and or replacement of electrically operated valves, and mechanically operated valves such as relief valves, pressure regulating valves, etc. Other items include Waste Water Pumping Equipment including controls, floats, air compressors and air lines as well as pumps, meters and accessories. Inspections and repair of check and isolation valves are also included.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents