Similar Projects
HVAC and Electrical Services
Term Contract
Post-Bid

20 Ton Indoor Handler Unit
Post-Bid
Columbia, SC

HVAC Maintenance and Repair Services
Term Contract
Results
Columbia, SC

Energy Savings Performance Services
Term Contract
Results
Columbia, Eastover, Hopkins, SC 29209

Make Up Air Unit
Post-Bid
Columbia, SC 29210

Tucker Center Chiller Replacement Project
Results
$700,000 to $922,000 est. value
Columbia, SC 29203

Sims/Aycock Building - Replace Control Valves
Post-Bid
$45,000 to $55,000 est. value
Columbia, SC 29201

J--Air Handler Filter Service
Results
Columbia, SC 29209

SC DMH Midlands Center Multizone HVAC Unit Replacement
Post-Bid
$200,000 to $240,000 est. value
Columbia, SC 29203

Monitoring and Controls of Two (2) Air Handling Units
Results
Columbia, SC 29201

Purchase of CTB Chiller and Compressor
Post-Bid
Columbia, SC 29202

McAdams Hall Duct Cleaning
Results
Less than $19,440 est. value
Columbia, SC

Roofing/HVAC Replacement - Richland Northeast High School
Post-Bid
Columbia, SC 29223

USC School of Medicine Med Park 15 - Replace AHU-1 and 2
Results
$120,000 to $140,000 est. value
Columbia, SC

HVAC Maintenance and Repair Services
Term Contract
Post-Bid
Columbia, SC 29204

Last Updated 02/08/2021 03:55 AM
Project Title

HVAC

Physical Address View project details and contacts
City, State (County) Columbia, SC 29203   (Richland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove existing HVAC systems to include disposal/debris removal and install replacement HVAC units and accessories identified below. Trane HVAC units are preferred as we are seeking to maintain consistency in service, parts and maintenance. 1. 12.5 ton Split Heat Pump for Urban Search and Rescue (Building #22) 2. 6 ton Split Heat Pump for Urban Search and Rescue (Building #22) 3. Honeywell T6 Thermostats 4. Condensers with phase monitoring or surge protection devices 5. Air handlers with condensate overflow protection and phase monitoring or surge protection devices 6. All new PVC drain lines 7. Connections to existing duct work and existing power requirements 8. Heat strips must meet or exceed existing heat strips 9. If line set is not replaced, it must be pressure tested, flushed and inspected and covered under warranty 10. Replace all drain pans 11. Meet all applicable codes

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents