Similar Projects
Site 45-M-SE-2 Middle School
New Construction
Conception
$46,700,000 est. value
Orlando, FL 32827

Lake Mary Elementary School Renovation
Renovation
Conception
$16,770,000 est. value
Lake Mary, FL 32746

Carrollwood Day School Center for Innovation
New Construction - 42,605 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Tampa, FL 33613

Dorothy Thomas Classroom Addition, Liberty Middle School Court Cover & Villemaire Transportation Site
Design
Tampa, FL

James S. Hunt Elementary - Smart Program Renovations
Renovation
Bidding
$4,500,000 est. value
Coral Springs, FL 33065

Margate Elementary School - Smart Program Renovations
Renovation
Bidding
$4,500,000 est. value
Margate, FL 33063

CMAR Services Renovations and Repair - Coral Sunset ES and Loggers' Run MS
Renovation
Sub-Bidding
$11,254,943 est. value
Boca Raton, FL 33428

Franklin Park Elementary School Temporary Campus
New Construction
Sub-Bidding
Fort Myers, FL 33905

Pinar Elementary School Comprehensive/Replacement Project Stormwater Revisions
New Construction, Renovation - 85,201 SF
Post-Bid
Less than $12,700,000 est. value
Orlando, FL 32800

Deerfield Beach Elementary School - Smart Program Renovations
Post-Bid
$3,777,000 est. value
Deerfield Beach, FL 33441

Construction Management Services for New Baker County K-5 School
Results
FL

Lauderdale Manors Elementary School - Smart Program Renovations
Renovation
Results
Less than $5,400,000 est. value
Fort Lauderdale, FL 33311

The Pine School
Addition - 22,369 SF
Construction
$6,800,000 est. value
Hobe Sound, FL 33455

Englewood Elementary School Building 6 Replacement
New Construction - 11,277 SF
Construction
$5,500,000 est. value
FL 34223

Old Hyatt Hotel Conversion
Renovation - 150,000 SF
Pending Verification
Kissimmee, FL

Last Updated 04/26/2022 04:33 AM
Project Title

Construction Manager at Risk for the New K-8 School "BB" - West Side Relief Project

Physical Address View project details and contacts
City, State (County) Kissimmee, FL 34746   (Osceola County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $33,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The new proposed school will be a Schenkel and Shultz Architecture K8 prototype for grades Kindergarten through Eighth grade and is being built to relieve Westside K8. The basis of this design will be a re-use of the 3-story, concrete tilt, K-8 School Prototype. The prototype school will accommodate the programs of the district resulting in approximately 159,000 GSF of new construction. The school will be situated on a 61+/- acre parcel. There are five wetlands on the property that total 18.2 acres although the architectural design will be such that little or no wetlands are impacted. The building will be designed with a high-performance envelope detailing to achieve SDOC’s required criteria of 25 or less Energy Utilization Index (EUI) and 0.20 cfm (cubic foot per minute) per envelope square footage. The work will include the construction of a small mock-up structure (PE storage building) to facilitate high-performance testing. The project will also include an EHPA enhanced gymnasium building with seating for 500. Site Amenities shall include separate parent and bus loops with aluminum-covered canopies along with approximately 180 parking spaces. Parent queue will be able to double stack approximately 180 cars on site. Athletic amenities on-site shall include a 400-meter running track with a soccer infield and (2) full-size exterior basketball courts. The facility will be designed as Net Zero Ready so that in the future, photovoltaic arrays can be installed on the roof, and will serve as a redundant IT hub for the school district.

Details

Elementary School, 3 Stories Above Grade, 159,000 SF New Construction, 61 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents