Similar Projects
Transportation Facility Pavement Rehabilitation
Infrastructure
Bidding
$700,000 est. value
Monroe, WA

2022 Pavement Repair Project
Infrastructure
Bidding
$235,000 to $305,000 est. value
Mukilteo, WA

8th Street Improvements Project
Alteration
Post-Bid
$739,767 est. value
Marysville, WA

2022 Street Overlay and ADA Ramps
Infrastructure
Post-Bid
$360,000 to $440,000 est. value
Stanwood, WA 98292

Harbour Reach Drive Improvements
Infrastructure
Results
$915,224 est. value
Mukilteo, WA 98275

Fisherman's Harbor Commercial Development Parcels A8 & A17
New Construction, Infrastructure, Alteration - 6,000 SF
Results
$4,300,000 to $4,700,000 est. value
Everett, WA 98213

2022 Slurry Seal
Infrastructure
Bidding
$275,000 to $355,000 est. value
Mukilteo, WA

Airport Parking Lot Access Modification
Term Contract
Post-Bid
WA

172nd Street NE & 40th Avenue Signal and Median Improvements
Infrastructure, Alteration
Results
$1,846,000 est. value
Arlington, WA 98223

Pavement Rehabilitation and Safety Improvements
Infrastructure
Bidding
$700,000 est. value
Tulalip Bay, WA

HASCO Properties - Asphalt Sealcoat, Stripe, and Miscellaneous Repairs
Infrastructure
Post-Bid
$3,000,000 est. value
Everett, Lake Stevens, Lynnwood, Marysville, Mountlake Terrace, Snohomish, WA 98043

164th Street SW Transmission Main Connection
Infrastructure
Results
$10,000,000 to $12,000,000 est. value
WA

Hermosa Heights Project
Infrastructure
Bidding
$700,000 est. value
Tulalip Bay, WA

Highway 99 Revitalization & Gateway Project - Stage 2 and 76Th Ave Overlay Project
Term Contract, Alteration
Post-Bid
Edmonds, WA

Exposed Sewer Pipe Repairs - Site 5
Infrastructure
Results
$3,200,000 to $3,700,000 est. value
Bothell, WA 98011

Last Updated 05/12/2022 12:20 AM
Project Title

2022 Overlay Program

Physical Address View project details and contacts
City, State (County) Edmonds, WA   (Snohomish County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The California Science Center is soliciting bids to procure all labor, including travel and per diem, transportation, equipment, supplies, and parts to remove existing rubber flooring and install approximately 300 square feet of stamped concrete in the Rot Room gallery. If you do not have Internet access, have any questions, or require clarification for the information contained herein, please contact Sindy Arreola at (213) 744-7681 or sarreola@californiasciencecenter.ca.gov. All questions regarding the content of this IFB must be submitted in writing by mail or electronically to Sindy Arreola (sarreola@californiasciencecenter.ca.gov) and must be received by the Key Action Date identified above. Questions not submitted in writing by the Key Action Date for submission of written questions shall be answered at the State's option. If the awarded Contract is in excess of $25,000, the winning bidder (Contractor) must provide the California Science Center a Payment Bond equal to 100% of the total amount of the contract within ten (10) business days of the contract award. The contract is tentatively scheduled to commence on June 1, 2022, and end May 31, 2023. Final Date to Submit Written Questions 04/26/2022 10:00 a.m. Project locations are as follows: 210th Pl SW - from 83rd Ave W to east end of road 82nd Place W - from 210th Pl SW to south end of road 211th Place SW - from 82nd Place W to east end of road 215th St SW - from 76th Ave W to 73rd Place W 73rd Place W - from 215th St SW to 216th St SW 92nd Ave W - from 228th St SW to 220th St SW 93rd Place W - from 228th St SW to 220th St SW 228th Pl SW - from west end (west of 98th Ave W) to east end of road 98th Ave W - from 228th Pl SW to 22524 98th Ave W 98th Ave W - from 224th St SW to 220th St SW 226th Pl SW- from 100th Ave W to east end of road 8th Pl S - from 15th St SW to south end of road 231st St SW from 106th Ave W to east end of road Nottingham Road - from Robin Hood Dr to Humber Lane Friar Tuck Lane -from Nottingham Rad to north end of road Alan A Dale Place - from Friar Tuck Lane to Robin Hood Drive Little John Court - from Robin Hood Drive to east end of road Humber Lane - from Nottingham Rd to Robin Hood Dr Robin Hood Drive from Humber Lane to 106th Ave W 241st Pl SW - from Firdale Ave to east end of road 242nd Pl SW from 241st Pl SW to east end of road Cemetery Alley -from west end to 104 th Ave W 80th Ave W - from 212st St SW to 206th St SW 209th St SW - from 80th Ave W to east end of road 207th Pl SW -from 80 th Ave W to east end of road

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents