Similar Projects
Duct Bank Relocation Acceleration, On Call, Boston and Cambridge
Infrastructure, Alteration
Bidding
$7,820,033 est. value
Boston, MA

Foster Street Paving, North End
Post-Bid
Boston, MA 02100

Capital Improvement Project 21-21 for HighwayReconstruction on Ruggles Street
Post-Bid
Boston, MA

Miscellaneous Airfield Pavement Improvements at Logan International Airport
Results
Less than $4,200,000 est. value
East Boston, MA 02128

Resurfacing and Related Work (Including 3 Bridge Decks) Along A Section of Interstate 93
Results
Less than $8,721,337 est. value
Boston, Milton, MA 02186

Construction Services - Drainage, Sidewalks and Roadways
New Construction
Construction
$2,268,000 est. value
Boston, MA

Orient Heights - Phase 3 Roadway Improvements
Construction
$3,150,000 est. value
Boston, MA 02128

Enterprise-Rent-A-Car
New Construction
Pending Verification
Chelsea, MA 02150

Deep Roadway Maintenance in all Areas
Post-Bid
Boston, MA

Tafts and Shirley Intersection Improvements
Results
Less than $167,000 est. value
Winthrop, MA

Capital Improvement Project 21-62 Roslindale Birch Street Plaza
Post-Bid
Boston, MA

Permanent Paving of Excavations Citywide
Results
$1,300,000 est. value
Boston, MA 02119

Inflow Removal Program - Contract 7A
Post-Bid
Revere, MA

Metropolitan Operations Paving
Results
Less than $1,583,770 est. value
Boston, MA

Pothole Repair
Infrastructure
Post-Bid
Dorchester, MA

Last Updated 05/03/2022 12:13 PM
Project Title

Willow Street Watts Street Central Avenue Utility Road and Traffic Improvements

Physical Address View project details and contacts
City, State (County) Chelsea, MA   (Suffolk County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,059,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes the construction of gravity sewer, storm drain, water main, roadway and traffic improvements along Willow Street, Watts Street and Central Avenue and appurtenant work as shown on the drawings and as specified herein. Work will include the full width pavement reclamation and overlay of approximately 2,400 linear feet of existing paved roadway including reset granite curbing, new concrete sidewalks and driveway aprons, lighting, plantings and appurtenant work. The work will also include the cleaning and CCTV inspection of existing gravity sewer and storm drains, cutting and plugging existing gravity sewer, construction of new drain and water main and appurtenances.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents