Similar Projects
Pheasant Run Road Culvert Replacement
Bidding
$90,000 est. value
West Chester, PA 19382

Ashenfelter Road Culvert Replacement
Bidding
Less than $250,000 est. value
Phoenixville, PA

Jacqueline Drive Drainage Mitigation Project
Post-Bid
Paoli, PA 19301

State Game Lands #183 Shooting Range Improvements
Post-Bid
Palmyra, PA

Plum Run Stream Restoration Phase 1
Results
West Chester, PA

Plum Run Stream Restoration, Phase 2
Results
West Chester, PA 19382

Anson B. Nixon Park Stream Restoration Phase 2 Project
Bidding
Kennett Square, PA 19348

Roberts Road Culvert Rehabilitation
Results
Wayne, PA 19087

Stream Bank Improvements
Bidding
Avondale, PA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Anson B. Nixon Park Stream Restoration Phase 1 Project
Results
Kennett Square, PA 19348

Laurelwood Road Culvert Project
Results
North Conventry Township, PA 19465

Gay Street Culvert and Stream Cleaning Project
Results
West Chester, PA

Chesterville Road Drainage
Results
$40,390 est. value
Landenberg, PA 19347

Favinger Road Culvert Replacement Project
Results
Less than $98,000 est. value
Pottstown, PA 19465

Last Updated 02/27/2020 01:18 PM
Project Title

Horseshoe Trail Stream Crossing

Physical Address View project details and contacts
City, State (County) Chester Springs, PA 19425   (Chester County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,400,000 to $1,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contract involves, but is not limited to: Removal of the existing bridge structure and guiderail, constructing new 3 span precast concrete arch bridge structure, installation of concrete revetment mattress under structure, installation, maintenance and removal of temporary erosion/sediment controls, removal of existing pavement section, building up the roadway, placing 3 herptile culverts with anti-seep collars, rock slope with geotextile, powder coated guiderail installation, installation, maintenance and removal of roadway detour, installation of wetland mitigation area and maintenance until fully stabilized, placement of 1.5” Depth Superpave Asphalt Mixture Design, WMA Wearing Course, PG 64-22, 0.3 to <3 Million ESALs, 9.5 mm Mix, SRL-H, 2.5” Depth Superpave Asphalt Mixture Design, WMA Binder Course, PG 64-22, 0.3 to <3 Million ESALs, 19 mm Mix, 4” Depth Superpave Asphalt Mixture Design, WMA Base Course, PG 64-22, 0.3 to <3 Million ESALs, 25.0 mm Mix and 6” Depth 2A Stone Subbase. Seeding and mulching of any disturbed areas, placing new and resetting existing post mounted signs. 3 Span Precast Concrete Arch Bridge Over Pickering Creek.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents