Similar Projects
LaCrosse - Westby, .17 Mi. E. Mathison Lane to High Echo Lane
Infrastructure
Bidding
La Crosse, Westby, WI

Lansing - Desoto, Iowa State Line to STH 35
Infrastructure
Bidding
De Soto, WI

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Seal Coat
Post-Bid
La Farge, WI

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Lacrosse - Westby, Brickyard Lane to CTH M
Results
La Crosse, Westby, WI 54602

Seal Coat
Post-Bid
La Farge, WI

2021 Infrastructure Improvements - Main Street
Results
La Farge, WI

Gravel and Seal Coat
Post-Bid
La Farge, WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Seal Coat Bids
Post-Bid
WI

2021 Street and Utility Reconstruction
Infrastructure
Results
Coon Valley, WI 54623

Genoa Paving
Term Contract
Post-Bid
$100,000 to $250,000 est. value
WI

Valley View Estates Lane Reconstruction
Infrastructure
Results
Coon Valley, WI

2021 Pedestrian Path Reconstruction
Infrastructure
Results
Coon Valley, WI

Last Updated 12/20/2021 12:54 AM
Project Title

Genoa - LaCrosse, V. Stoddard N Limit to N. County Line

Physical Address View project details and contacts
City, State (County) WI   (Vernon County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $75,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Vernon County; 5160-06-70, WISC 2022 066; STH 35; 4.091 Miles; Base Aggregate Dense, Pavement Marking, Construction Staking, Culvert Pipe Reinforced Concrete, HMA Pavement, Removing Asphaltic Surface Milling, Tack Coat, and Curbs Treated Timber. Base Aggregate Dense, 228 Ton; Marking Epoxy, 59,237 LF; Marking Paint, 13,083 LF; Construction Staking, 21,690 LF; Construction Staking, 1 LS; Culvert Pipe, 8 LF 24”, 24 LF 36“; HMA Pavement, 10,741 Ton; Removing Asphaltic Surface Milling, 95,829 SY; Tack Coat, 6,713 Gals; Curbs Treated Timber, 274 LF

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents