Similar Projects
Last Updated | 04/26/2023 01:04 PM |
Project Title | LRRT - Under Platform Conduit Replacement |
Physical Address | View project details and contacts |
City, State (County) | Buffalo, NY 14209 (Erie County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids |
Project Status | All Bids Received, Results Expected, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $550,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Replace existing conduit to include, but not be limited to: Remove all conduit on the Platform Level which have severely deteriorated. These conduits will be replaced with new fiberglass conduits to prevent future deterioration. New cabling will also be provided to replace the existing cabling. A stainless steel chase shall be provided alongside the elevators on each side of the station. Stainless steel pull boxes would be located at the ceiling slab for transition to the horizontal section which will cross above the tracks. A sheet metal screen will be routed below the conduits to obscure the view of them. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 7% Women Owned Sub-Contracting Goal: 23% Service-Disabled Veteran-Owned Business Contracting Goal: 6% Contract term: 109 Days |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |