Similar Projects
Athens Street Improvements - City of Gainesville
Infrastructure, Alteration
Conception
$250,000 est. value
Gainesville, GA 30501

Mitchell Street Improvements - City of Flowery Branch
Infrastructure
Conception
$851,126 CJ est. value
Flowery Branch, GA 30542

RFP Construction Manager at Risk - Lyman Hall Elementary - Additions and Renovations 2022
Addition, Demolition, Renovation, Infrastructure
Design
$26,000,000 CJ est. value
Gainesville, GA 30504

Sanitary Sewer Ream and Reline (8" DIP)
Infrastructure
Design
$200,000 CJ est. value
Flowery Branch, GA 30542

Flat Creek Water Reclamation Facility (WRF) Raw Sewage Pumps Check Valve Replacement Project
Infrastructure
Bidding
$120,000 CJ est. value
Gainesville, GA 30504

Runway 5-23 Rehabilitation
Infrastructure
Bidding
$1,200,000 CJ est. value
Gainesville, GA 30501

AutoZone #0914 / Gainesville
New Construction, Infrastructure - 15,295 SF
Post-Bid
$1,500,000 CJ est. value
Gainesville, GA 30501

Industrial Park West - Site Only
New Construction
Post-Bid
$10,000,000 CJ est. value
Gainesville, GA 30501

Wauka Mountain Elementary School - Site Improvements
Results
Gainesville, GA 30506

Lanier Elementary- Site Improvements
Infrastructure
Results
Gainesville, GA 30506

Mundy Mill Road Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$64,000,000 CJ est. value
Oakwood, GA 30566

Lanier Christian Academy Campus
Addition, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Flowery Branch, GA 30542

SR 53 Fm CS 656 / Cedar Ridge Dr to S of SR 211 / Tanner Mill Rd
Infrastructure
Design
$2,000,000 CJ est. value
Gainesville, GA 30501

Candlewood Suites / Oakwood
New Construction, Infrastructure - 112,112 SF
Bidding
$10,000,000 CJ est. value
Oakwood, GA 30566

Flowery Branch WRF Upgrade to 2.2-MGD
New Construction, Renovation, Infrastructure
Post-Bid
$40,000,000 CJ est. value
Flowery Branch, GA 30542

Last Updated 08/22/2022 01:33 PM
Project Title

Moss Farm

Physical Address View project details and contacts
City, State (County) Lula, GA 30554   (Hall County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $200,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 519 home subdivision with 3 tennis courts, a swimming pool, and clubhouse. As of August 22, 2022, this project is in planning. An impact study has been completed. Moving forward the project will need approval from the Lula City Council. Information regarding an architect and general contractor has not been disclosed. A firm timeline has not been confirmed.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Apartments, 519 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents