Last Updated | 09/06/2023 12:10 PM |
Project Title | FY24 HYCC Mechanical Improvements RTU1 & Core Replacement - Sub |
Physical Address | View project details and contacts |
City, State (County) | Barnstable, MA 02601 (Barnstable County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $25,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate - 08/02/23 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Location: Last date to submit questions: August 18, 2023 by 12:00 Noon in the procurement portal A. In general, the Contractor shall supply all material, labor, equipment, insurance, temporary protection, tools and appliances necessary for the proper completion of the work as described in the Plans and Specifications, in accordance with good construction practice, and as required by the materials manufacturers. B. Supply all shoring and protection necessary to protect the occupants, building area, building systems, and landscape areas. All means and methods are the responsibility of the contractor. The Contractor is solely responsible for safety on the job site. C. The work includes, but is not limited to: 1. General: Protect interior finishes and furnishings from the work. Repair and replace damaged materials to the satisfaction of the Owner. 2. Immediately upon signed contract, submit project schedule for review and approval. Schedule shall reflect the time required for the Contractor to procure and install the project equipment, e.g., the RTU, which are understood to havelong lead times. Work shall begin after August 31, 2023, and shall be Substantially Complete by November 30, 2024. Contractor shall phase the Work around the occupants and coordinated with the Owner. 3. If there is a conflict between or within any part of the plans and specifications, the more stringent requirement shall apply at the sole discretion of the Architect. Electrical, Plumbing, Roofing |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |