Similar Projects
Lighthouse Point / North St. Louis Riverfront
New Construction, Infrastructure
Conception
$325,000,000 CJ est. value
Saint Louis, MO 63138

Shake Shack / Des Peres
New Construction, Infrastructure - 3,453 SF
Design
$1,000,000 CJ est. value
Des Peres, MO 63131

Logan University Fuhr Science Center
Addition, Demolition, Renovation, Infrastructure - 14,400 SF
Design
$28,000,000 CJ est. value
Chesterfield, MO 63017

New Ballwin Road Improvements
Infrastructure
Bidding
$900,000 CJ est. value
Ballwin, MO 63021

RFQ D/B - I-55 Corridor Improvements - Missouri Department of Transportation
Infrastructure
Bidding
$246,000,000 CJ est. value
Saint Louis, MO 63131

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Rehabilitation of Abandoned Property
Renovation, Infrastructure
Post-Bid
Ferguson, MO

Gateway Arch National Park Site Improvements
Infrastructure
Results
Saint Louis, MO

Engine House 2 and 3
New Construction
Results
Saint Louis, Wildwood, MO 63005

The McKenzie
New Construction, Infrastructure
Construction
$107,500,000 CJ est. value
Saint Louis, MO 63124

The James / St. Louis
Demolition, New Construction, Infrastructure - 7,000 SF
Construction
$66,000,000 CJ est. value
Saint Louis, MO 63122

West Adams Avenue Condominiums / Kirkwood
New Construction, Infrastructure - 8,817 SF
Pending Verification
$2,000,000 CJ est. value
Kirkwood, MO 63122

Real Dill Pickleball Club At The District
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Chesterfield, MO 63005

Woods Mill Center / Maryville University Esports Arena and Mixed Use
New Construction, Infrastructure - 6,000 SF
Design
$100,000,000 CJ est. value
Town and Country, MO 63017

North Hanley Road (A) Resurfacing
Infrastructure
Bidding
$1,914,300 CJ est. value
Saint Louis, MO 63121

Last Updated 12/01/2022 09:41 AM
Project Title

Lower Meramec Wastewater Treatment Plant Facility Expansion Phase II

Physical Address View project details and contacts
City, State (County) Saint Louis, MO 63129   (Saint Louis County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $114,443,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

A general description of the work to be done under these contract documents consists of: - Improvements to Existing Influent Pump Station, Fine Screen Facilities, Primary Piping, Administration Building, Solids Processing and Disinfection System. - Construction of new main treatment train, including Primary Clarifiers, Aeration Basins, Blower Building, Final Clarifiers and Odor Control. - Demolition of existing secondary treatment system. - All associated civil, structural, mechanical, electrical and instrumentation installations as well as demolition.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents