Similar Projects
Timnath Reservoir Shoreline Improvements
Post-Bid
Less than $500,000 est. value
Timnath, CO

Copperleaf Water Quality Pond J Improvements
Post-Bid
$450,000 to $625,000 est. value
Aurora, CO

Z--BLM CO NWD KFO Junction Butte Dsgn-Bld
Results
$25,000 to $100,000 est. value
Kremmling, CO 80459

Castle Rock Troop Office Retaining Wall Repair / Replacement and Lot Drainage
Results
Less than $325,000 est. value
Castle Rock, CO 80109

Irrigation Ditch
Post-Bid
Boulder, CO

Kahil Storm Drainage Project
Results
Less than $1,072,736 est. value
Fort Lupton, CO 80621

Range View Estates Phase 1 Public Infrastructure Project
Post-Bid
Mead, CO 80542

Anson Rudd House Exterior Drainage Improvements and Porch Rehabilitation
Results
Canon City, CO 81212

Oligarchy Ditch Relocation Project
Post-Bid
CO

PKAA, West Sopris Coal Refuse Project 620E
Results
Less than $1,000,000 est. value
Trinidad, CO

CO Erfo 250(1) Alamosa Canyon Road
Post-Bid
$250,000 to $500,000 est. value
CO

Root & Ratliff Salinity Control Pipeline Project
Results
$2,350,000 to $2,850,000 est. value
Mancos, CO

Manitou Springs Creekwalk Trail Phases 4 and 5 Survey, Row and Design
Post-Bid
Manitou Springs, CO

Culverts 2020
Results
$10,000 to $20,000 est. value
Steamboat Springs, CO 80487

Vault, Secondary Splice Box
Post-Bid
Fort Collins, CO

Reported 04/22/2022 12:00 AM
Project Title

2022 Culvert Liners

Physical Address View project details and contacts
City, State (County) Montrose, CO   (Montrose County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For three (3) slip liner pipes. The liner pipes will be installed by Montrose County crews in existing culverts near Nucla.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents