Similar Projects
Moon Golf Club Storage Building - Site Work Construction
New Construction - 5,000 SF
Bidding
Moon Township, PA 15108

2021 Bauman Avenue Stormwater Program
Infrastructure
Bidding
Brentwood, PA 15227

Bayard Street Storm Sewer Separation Phase 3 and 4
Post-Bid
Elizabeth, PA 15037

Village of Hutchinson Storm Sewer / Paving Program
Post-Bid
Sewickley, PA 15143

Repair the Storm Water Piping at North Allegheny Senior High School
Results
Wexford, PA

Carrie Furnace Redevelopment Project - Western Phase
Results
$1,300,000 to $1,500,000 est. value
Monroeville, PA 15146

2021 Stromwater Improvements
Infrastructure
Bidding
Pittsburgh, PA

Herminie Storm Sewer/Paving Project - Phase 2
Post-Bid
Sewickley, PA 15143

Catch Basin Replacement, Munhall Borough
Results
$40,000 to $60,000 est. value
Munhall, PA 15120

Cypress Hill and Cedarwood Drive Storm Sewer Repairs
Post-Bid
Penn Hills, PA 15235

Mclean Playground Drainage Improvements, Homestead Borough
Results
$25,000 to $50,000 est. value
Homestead, PA 15120

2020 Whitehall Borough Capital Lining Program
Post-Bid
Pittsburgh, PA 15236

Stormwater Control Measures
Results

2020 Emergency Annual Sanitary and Storm Sewer Repair
Post-Bid
Clairton, PA 15025

Woodhill Drive Storm Sewer Project
Results
$70,000 est. value
Gibsonia, PA 15044

Reported 06/11/2021 12:00 AM
Project Title

2021 Capital Lining Program

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA   (Allegheny County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves sanitary sewer CIPP MH to MH lining repairs including internal reinstatement of active service laterals, cutting of any protruding taps, light and heavy cleaning, pre-CCTV verification, and NASSCO certified MH to MH post repair CCTV. All related traffic control, resident notification, and restoration of disturbed areas are also included in the project. Proposals shall be delivered in a sealed envelope and clearly marked on the outside with the words

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents