Similar Projects
Page Hall Renovation
Renovation, Alteration - 30,000 SF
Design
Raleigh, NC 27695

Z2DA--Install Emergency Power for HVAC
Term Contract
Post-Bid
$1,000,000 to $2,000,000 est. value
Durham, NC 27705

Dabney Hall Phase 3, 8th Floor HVAC Renovations
Alteration
Post-Bid
Raleigh, NC

Administration Building AHU Replacement
Results
$276,915 est. value
Durham, NC 27701

Z2DZ--Renovate and Replace Pharmacy AHUs
Results
$1,000,000 to $5,000,000 est. value
Durham, NC 27705

Donald W Eaddy Building - HVAC and Lab Exhaust Upgrades and Repairs
Alteration
Post-Bid
$1,600,000 est. value
Raleigh, NC

HVAC Chemical Water and Drain Treatment Services at Durham County Facilities
Results
Less than $30,733 est. value
Durham, NC

Gas Water Heater and HVAC Venting Replacements
Alteration
Post-Bid
Raleigh, NC 27604

HVAC Equipment Maintenance and Repair Services at Various DCO Facilities
Alteration
Results
Durham, NC

Variable Frequency Drive Maintenance Services
Term Contract, Infrastructure
Post-Bid
Durham, NC 27705

Leesville Road Campus HVAC Upgrades
Alteration
Results
Raleigh, NC 27613

Brogden Middle School - Boiler Replacement
Alteration
Post-Bid
Durham, NC 27704

Preventive Maintenance for Electronic Cabinet Coolers
Alteration
Results
Raleigh, NC

Air Filters
Alteration
Post-Bid
NC

Fan Coil Units
Alteration
Results
$149,640,350 est. value
Durham, NC

Last Updated 12/20/2022 10:39 AM
Project Title

Sherwood Githens Middle School Chiller Replacement

Physical Address View project details and contacts
City, State (County) Durham, NC 27707   (Durham County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $376,900 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For furnishing of labor, material, and equipment for the DPS Sherwood Githens Middle School Chiller Replacement Removal/replacement of existing air cooled chiller, removal/replacement of existing primary chilled water pump, removal/replacement of existing secondary chilled water pump, and associated electrical support. No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of sixty (60) days. Bid security required is 5% of the bid in cash, certified check, or Bid Bond. Performance and Payment Bonds for 100% of the contract amount will be required. Durham Public Schools reserves the right to reject any and all bids and to waive informalities or irregularities. Bidders shall note that compliance with County of Durham MBE policies and the North Carolina Statute 143-128.2 (c) are required for this project. The successful bidder will be required to conform to the wage requirements prescribed by the federal Davis-Bacon and Related Acts which requires that all laborers and mechanics employed by contractors and subcontractors performing on contracts funded in whole or in part with federal funds in excess of $2,000 pay their laborers and mechanics not less than the prevailing wage rates and fringe benefits, as determined by the Secretary of Labor, for corresponding classes of laborers and mechanics employed on similar projects in the area. Bidders shall note that the submission of a bid constitutes the bidders certification to the State Treasurer that, as of the date of bid, it is not listed on the Final Divestment List created and maintained by the North Carolina Department of State Treasurer (the Treasurers Office) pursuant to the Iran Divestment Act of 2015, Chapter 147-Article 6E of the General Statutes of North Carolina (the Iran Divestment Act) A preferred brands conference shall follow the pre-bid conference at 10:30am. Inspection of the project site shall follow. Issue RFP: 11/22/2022 Last RFI: 12/6/2022, 2:00pm Last Addenda: 12/8/2022, 3:00pm BOE Approval: 1/12/23 Each proposal shall be accompanied by a statement of qualifications that demonstrates experience in at least five (5) projects of similar scope within the past three (3) years with references. Each proposal shall be accompanied by a statement of ability to staff including current project load, current staff levels, and individual staff to be committed to this project if awarded. Direct all inquiries concerning this RFP to: Durham Public Schools, Attn: Tanita Nicholson All questions my be submitted via email no later than 2:00pm on Tuesday, December 6, 2022.. Email: dist.purchasing@dpsnc.net

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents