Similar Projects
Remove and Replace Selected Common Hallway Carpeting
Bidding
Gardner, MA

Flooring Services/WPS
Term Contract
Post-Bid
Worcester, MA

Gym Floor Installation - Greendale Head Start Center/WPS
Post-Bid
Worcester, MA 01608

Worcester Challenge and Reach Academy Window/Door/Roof and Boiler Replacement - Sub-Bids
Results
Less than $4,800,000 est. value
Worcester, MA 01609

Remove and Replace Rolled Carpet, Cove Base and VCT with Carpet Tile, Cove Base and VCT
Results
Less than $45,000 est. value
Clinton, MA

Carpeting at Forbush Memorial Library
Post-Bid
Less than $55,000 est. value
Westminster, MA 01473

Interior Finish Renovations at Maher Court - Filed Sub Bids
Renovation
Results
$311,100 est. value
Milford, MA 01757

Tile for the Grafton Public Library
Post-Bid
North Grafton, MA 01536

2019 Roof and Boiler Replacements - Filed Sub Bids
Results
$6,504,663 est. value
Worcester, MA 01604

UMASS Medical School Library Carpet Replacement
Post-Bid
Less than $160,000 est. value
Shrewsbury, MA 01545

Dance Floor System Replacement - Burncoat Middle School / WPS
Post-Bid
Worcester, MA

Removal and Replacement of the Existing Flooring
Post-Bid
Less than $22,000 est. value
Northborough, MA

Improve Existing Stairwells - General Bids
Post-Bid
Less than $140,000 est. value
Shrewsbury, MA

Improve Existing Stairwells - Sub-Bids
Post-Bid
Less than $140,000 est. value
Shrewsbury, MA

Asbestos Abatement and Flooring and Ceiling Replacement
Post-Bid
Less than $115,000 est. value
Lunenburg, MA

Last Updated 03/01/2021 10:05 AM
Project Title

Mid Rise Hallway Carpet Replacement

Physical Address View project details and contacts
City, State (County) Clinton, MA 01510   (Worcester County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $45,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of: Removing rolled carpeting , cove base and VCT and replacing with carpet tile, new cove base and slip resistant VCT (Foyer)in all five (5) Common Hallways of Presentation Apartments Mid-Rise Development

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents